Similar Projects
Deep Fork Greenway Trail - Northeast Oklahoma City (Ward 7)
Infrastructure
Conception
Oklahoma City, OK

Cemetery, Czech, Reno, North West 10 - Area bound by North Cemetery Road, North Czech Hall Road, West Reno Avenue, North West 10 (Ward 3) - City of Oklahoma City
Infrastructure, Alteration
Conception
$3,050,000 est. value
Oklahoma City, OK 73102

University Of Tulsa Thomas Plaza
Renovation, Alteration
Design
Tulsa, OK 74104

Construction of Concrete Ramp
Infrastructure
Design
$247,300 CJ est. value
Tulsa, OK 74105

Wanette Water System Improvements
Infrastructure
Bidding
$450,000 CJ est. value
Wanette, OK 74826

Eastern Ave Widening and Reconstruction SE 19th St to SE 4th St
Infrastructure
Bidding
$300,000 CJ est. value
Moore, OK 73160

RFQ - OU First Year Housing Project - Demolition and Implosion
Demolition
Sub-Bidding
$500,000 CJ est. value
Norman, OK 73072

Norman Line Maintenance Facility Bid Package #1
New Construction, Infrastructure
Sub-Bidding
$3,650,000 CJ est. value
Norman, OK 73069

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Research Lab Improvements
Renovation
Post-Bid
Norman, OK 73069

WCC Office Renovation
Renovation
Results
$622,000 est. value
Oklahoma City, OK 73105

Kiamichi Tech Stigler Campus Remodel
Renovation
Results
Stigler, OK 74462

AEP Laydown Yard Expansion Project
Infrastructure - 424,274 SF
Construction
$38,982,295 CJ est. value
Tulsa, OK 74108

200 North Yukon Parkway
New Construction, Infrastructure
Pending Verification
Yukon, OK 73099

New Saigon Apartments
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Oklahoma City, OK 73106

Last Updated 08/24/2022 03:33 PM
Project Title

College of The Muscogee Nation Education Facility and Exhibit/Lecture Hall

Physical Address View project details and contacts
City, State (County) Okmulgee, OK 74447   (Okmulgee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Package 2A: Site Work Bid Package 3A: Concrete Bid Package 3B: Insulating Concrete Forming Bid Package 4A: Masonry Bid Package 4B: Adhered Stone Masonry and Cement Plastering Bid Package 5A: Structural Steel Bid Package 6A: Architectural Woodwork Bid Package 7A: Roofing & Metal Wall Panels Bid Package 8A: Doors, Frames, Hardware Bid Package 8B: Storm Coiling Doors Bid Package 8C: Glass and Glazing Bid Package 9A: Ceilings, Drywall, and Light Gauge Framing Bid Package 9B: Flooring Bid Package 9C: Terrazzo Flooring Bid Package 9D: Paint and Wall Coverings Bid Package 10A: Bathroom Partitions, Accessories, Fire Protection Specialties, Visual Displays Bid Package 10B Accordion folding doors & Operable Partitions Bid Package 10C: Signage Bid Package 12A: Manual Roller Shades Bid Package 21A: Fire Suppression Bid Package 22A: Plumbing Bid Package 23A: HVAC Bid Package 26A: Electrical Bids will be opened privately after the closing time and reviewed with the owner. Last day for questions 5:00 P.M. CST - Tuesday 08-16-2022 The owner reserves the right to reject any or all bids and waive irregularities. Indian Preference applies to all Native and CESO entities per CESO Laws and Regulations. Direct all bidding questions to: Kevin Gardenhire, Project Manager Mask Builders, LLC 555 N Elm St Jenks, OK 74037 O: (918) 392-7083 F: (918) 392-7084

Details

1 Story Above Grade, 13,001 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents