Similar Projects
Silverleaf Development Master Plan
New Construction
Conception
Winter Garden, FL 34787

Kensington Church Campus Master Plan
New Construction
Conception
Winter Garden, FL 34787

MDM Boutique Hotel at Morse and Penn
New Construction - 115,646 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Winter Park, FL 32789

Pearl Eagles Boutique Hotel
New Construction - 67,402 SF
Design
Orlando, FL 32821

Underdrains Installation and Repairs
Post-Bid
Less than $6,771,550 est. value
FL

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Results
$2,000 to $5,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Lake Nona WAVE Hotel
New Construction
Construction
Orlando, FL

Apopka City Center - Master Plan
New Construction - 200,000 SF
Construction
$100,000,000 est. value
Apopka, FL 32703

AdventHealth Mixed-Use Campus - Master Plan
New Construction
Conception
Orlando, FL 32832

TownePlace Suites at Grand National
New Construction
Design
Orlando, FL 32819

South Water Reclamation Facility Flow Meter Improvements
Infrastructure
Results
$2,186,000 est. value
Orlando, FL 32819

Hilton Garden Inn at Apopka City Center
New Construction
Construction
$18,000,000 est. value
Apopka, FL 32703

Tru by Hilton Hotel
New Construction
Conception
Orlando, FL 32836

WoodSpring Suites
New Construction - 51,048 SF
Design
$7,500,000 est. value
Orlando, FL 32826

Last Updated 05/04/2022 11:43 AM
Project Title

Aloft Hotel and Conference Center

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method
Project Status Construction Commenced April 2022, Construction Completion Expected December 2023
Bids Due View project details and contacts
Estimated Value $30,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hotel complex to include an attached 17,617 SF Conference Center, 1513 SF Fitness area, Breakfast room, Patio and Pool

Details

Hotel/Motel, 6 Stories Above Grade, 148,136 SF New Construction, 205 Unit(s), 9.61 Acres.
Division 02 - Existing Conditions, Geotechnical Investigations, Material Testing.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry, Stone Masonry, Stone Masonry Veneer.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Structural Metal Stud Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Bar Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Exhibit Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Art, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Hotel and Motel Furniture, Restaurant Furniture.
Division 13 - Special Construction, Swimming Pools, On-Grade Swimming Pools, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevators, Elevator Equipment and Controls, Facility Chutes, Laundry and Linen Chutes, Trash Chutes.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents