Similar Projects
Phase III Boston Post Road (Route 20) Water Main Improvements
Post-Bid
Less than $1,400,000 est. value
Wayland, MA 01778

Catch Basin Cleaning
Post-Bid
Less than $40,000 est. value
Winchester, MA

Construction of Nemasket River Water Main Crossing at Wareham Street
Results
Less than $300,000 est. value
Middleborough, MA

Z--CACO Chlorination Upgrades to Eight Public Water S
Results
$25,000 to $100,000 est. value
MA

Downtown Area Collection System and Pumping Stations
Construction
$13,000,000 est. value
Orleans, MA 02653

Water Meter Upgrade
Post-Bid
Uxbridge, MA

Police and Fire Station Sewer Replacement Project
Results
Less than $105,000 est. value
Fairhaven, MA 02719

Automatic Meter Reading System
Term Contract
Post-Bid
Lexington, MA 02420

Water Mains and Appurtenances - Cedar Street Area and Hanlon Road
Results
Less than $1,300,000 est. value
Holliston, MA 01746

Supply of AMI Equipment - Contract 5
Post-Bid
Less than $590,000 est. value
Fall River, MA

Sewer System Infiltration Rehabilitation – Year 14
Results
$1,100,000 est. value
Milton, MA 02186

Fire Alarm and Sprinkler System Maintenance and Repair Services
Post-Bid
Less than $202,500 est. value
Brookline, MA

Contracts 2019 - Sewer & Drain Repairs
Term Contract
Results
$400,000 est. value
Northampton, MA 01060

Sewer System Rehabilitation and Improvements
Post-Bid
Less than $3,400,000 est. value
Lawrence, MA

Ductile Iron Pipe and Fittings
Results
Danvers, MA

Last Updated 12/02/2020 08:49 AM
Project Title

Curtisville Bridge Temporary Utilities Relocation and Related Work

Physical Address View project details and contacts
City, State (County) Stockbridge, MA 01262   (Berkshire County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $280,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Curtisville Bridge Temporary Utilities Relocation & Related Work. Work includes the relocation of water and sewer lines currently within a bridge structure.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents