Similar Projects
Water Treatment Plant - FRP Brine Tank - 2154350 - City of Broken Arrow
Alteration
Conception
Broken Arrow, OK

Construction of Certain Improvements on the Water Tower 10 Repair and Repainting Project
Infrastructure, Alteration
Bidding
$70,000 est. value
Vinita, OK

Milk Tank for Oklahoma State University Dairy
Infrastructure
Bidding
$75,000 est. value
Stillwater, OK

Plating Tank Repair
Post-Bid
Oklahoma City, OK

Construct Fire Protection Water Tank & System, Multi
New Construction, Demolition
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK 73701

Water Tower Repair
Renovation
Results
El Reno, OK 73036

Kingfisher Disinfection Byproduct Reduction
Infrastructure
Results
Kingfisher, OK

Construct Fire Protection Water Storage Tank ?? EM to see if same as 2185108- Tanks sizes are different but project dates/site visits exactly SAME
Infrastructure
Post-Bid
$1,000,000 to $5,000,000 est. value
Enid, OK

Underground Storage Tank Removal - JHCC
Infrastructure
Results
$482,925 est. value
Lexington, OK 73051

Water Tank Rehabilitation
Alteration
Post-Bid
$350,000 est. value
Krebs, OK

Repair Water Distribution System, Multi
Term Contract
Results
$10,000,000 est. value
Enid, OK 73705

D/B - Dustin Water Storage Tank Project
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Dustin, OK

2021 Water System Improvements - Mingo Water Storage Tank Rehabilitation
Infrastructure
Results
Bixby, OK

2021 WTP Clearwell
Infrastructure
Post-Bid
$1,100,000 est. value
Wewoka, OK

2.0 MG Elevated Storage Tower - 33 Road and Kelly TWR-4
Infrastructure
Results
Edmond, OK

Last Updated 07/18/2022 01:48 AM
Project Title

Water System Improvements East Lake Upper Storage Tank

Physical Address View project details and contacts
City, State (County) Sallisaw, OK   (Sequoyah County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following: Water Storage Tank complete including telemetry and all appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents