Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

4th Avenue Apartment Building With Hotel And Retail
New Construction, Infrastructure - 200,000 SF
Conception
Seattle, WA 98121

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Herzman Levee Setback Design
Infrastructure
Design
$500,000 CJ est. value
Coles Corner, WA 98826

I-405, Brickyard to SR 527 Improvement Project
Infrastructure
Bidding
$525,000,000 CJ est. value
Bellevue, WA 98006

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

2nd Avenue Mixed-Use Tower
Demolition, New Construction, Infrastructure
Post-Bid
$45,000,000 CJ est. value
Seattle, WA 98101

Rt 44 Transit Plus Multimodal Corridor
Alteration
Results
Seattle, WA

Lake to Sound Trail - Segment C SeaTac - Rebid
Infrastructure
Results
$6,857,857 CJ est. value
Seatac, WA 98188

Boren Avenue Office Tower
New Construction, Infrastructure - 282,700 SF
Construction
$56,000,000 CJ est. value
Seattle, WA 98101

Magnuson Park Community Center Improvements
New Construction, Renovation - 8,400 SF
Construction
$2,650,000 est. value
Seattle, WA 98115

Chapter Buildings
New Construction, Infrastructure - 330,800 SF
Pending Verification
$88,000,000 CJ est. value
Seattle, WA 98105

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

18th Avenue Mixed Use Development
New Construction, Infrastructure - 56,355 SF
Design
$29,000,000 CJ est. value
Seattle, WA 98106

Last Updated 03/10/2023 05:06 PM
Project Title

RFQ D/B - Community Center Expansion Project

Physical Address View project details and contacts
City, State (County) Snoqualmie, WA 98065   (King County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Site Development, Swimming Pool(s)
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $24,900,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be to design and construct additions to the existing Community Center that will include, but not be limited to a swimming pool, locker rooms, multi-purpose spaces, meeting space, offices and support spaces and site improvement. The con- structi.on will be scheduled and phased to allow the existing facil-ity to remain occupied and oper-ational during construction. The design and construction budget for this project is approximately $24,900,000. Questions specific to this RFQ shall be directed to Jeff Hamlin, Deputy Director of Parks and Rublic Works, via, email at jham-lin@snoqualmniewa.gov..P.lease include "Community Center Expansion RFQ" in the "subject" line of the email.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents