Similar Projects
River Road Rehabilitation -3269- Rockland County
Infrastructure
Conception
$11,700,000 est. value
Stony Point, NY 10980

Aktina Medical Addition
Addition, Demolition, Renovation, Infrastructure - 8,183 SF
Design
$1,000,000 CJ est. value
Congers, NY 10920

New Firehouse Facility - General Construction
New Construction, Infrastructure
Bidding
$8,500,000 CJ est. value
Tappan, NY 10983

Main Street Improvements
Infrastructure
Bidding
$420,000 CJ est. value
Nyack, NY 10960

New Firehouse Facility - Mechanical
New Construction, Infrastructure
Sub-Bidding
$2,900,000 CJ est. value
Tappan, NY 10983

New Firehouse Facility - Plumbing
New Construction, Infrastructure
Sub-Bidding
$880,000 CJ est. value
Tappan, NY 10983

Lake Suzanne Dam Rehabilitation Project
Renovation
Post-Bid
Spring Valley, NY

LiDL #1456 / Tappan
New Construction, Infrastructure - 25,677 SF
Post-Bid
$6,700,000 CJ est. value
Tappan, NY 10983

Culvert Job Order Contract: NYSDOT Region 8
Results
$1,200,000 est. value

Hurd Avenue and Kinsman Lane Drainage Improvements
Results
West Haverstraw, NY

Extra Space Storage - Site Work
New Construction
Construction
$5,000,000 to $10,000,000 CJ est. value
Pearl River, NY 10965

North Highland Avenue Mausoleum Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Nyack, NY 10960

DataBank Data Center / Orangeburg - Phase 1
New Construction, Infrastructure - 187,000 SF
Pending Verification
$40,000,000 CJ est. value
Orangeburg, NY 10962

New Firehouse Facility - Electrical
New Construction, Infrastructure
Sub-Bidding
$440,000 CJ est. value
Tappan, NY 10983

2021 Road Improvements
Infrastructure
Post-Bid
Monsey, NY

Last Updated 08/08/2022 10:34 AM
Project Title

Demarest Kill Dam Rehabilitation Project

Physical Address View project details and contacts
City, State (County) New City, NY 10956   (Rockland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $3,694,960 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 8, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The scope of work for this contract consists of rehabilitation of the Demarest Kill Dam. The work includes removal and replacement of the spillway, leveling and filling the dam crest, vegetation removal, installation of a steel sheet pile wall with tie backs in the existing embankment, removal of the existing masonry wall at the downstream embankment, installation of a cast-in-place concrete wall on the downstream embankment, installation of pre-cast box culvert, and installation of a straight drop stilling basin with rip-rap stone at the base of the culvert. General Requirements - Insurance Required - Prevailing Wage Required - Certified Payroll Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % Job Location Demarest Kill County Park, New City NY Question Acceptance Deadline 06/23/2022 03:00 PM EDT Questions are submitted online No

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents