Similar Projects
Atrium Medical Building
New Construction - 25,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Cornelius, NC 28031

Spring Branch Lot 12
New Construction - 26,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clayton, NC 27520

Cottages at College Acres Phase 4
New Construction, Infrastructure - 12,800 SF
Design
$1,000,000 CJ est. value
Wilmington, NC 28403

Cabarrus County Emergency Medical Services (EMS) Headquarters (HQ) Construction
New Construction - 30,000 SF
Post-Bid
Concord, NC

Wren Family Estates - Sitework
New Construction - 12,618 SF
Post-Bid
Siler City, NC 27344

Runway 23L Approach Clearing Project
Results
Greensboro, NC 27400

DPS - Rockingham Youth Development Center- Grading and Utilities
Results
Rockingham, NC 28379

Sharon Road Mixed Use
New Construction, Renovation - 178,500 SF
Construction
$10,000,000 CJ est. value
Charlotte, NC 28211

Novant Health Ballantyne Medical Center
New Construction - 224,000 SF
Construction
$180,000,000 est. value
Charlotte, NC

Senior Continuing Care Retirement Community
New Construction
Design
Cherokee, NC

Limited Construction Services Contract - Civil/Sitework
Term Contract, Infrastructure
Post-Bid
Wilmington, NC

National Pan Hellenic Council Garden - Legacy Plaza
Results
$600,000 to $800,000 est. value
Chapel Hill, NC

Creekside Vet
New Construction - 6,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Archdale, NC 27263

Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

Peeler Community Park Site Improvements and Renovations
Renovation
Post-Bid
Greensboro, NC 27405

Last Updated 11/09/2022 03:11 PM
Project Title

Daymark Recovery (Sandhills Mental Health)

Physical Address View project details and contacts
City, State (County) Rockingham, NC 28379   (Richmond County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Park/Playground, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK: Courtyard and Security Fence area at Daymark Recovery Center, Rockingham, North Carolina. Sub Trades needed - landscape, concrete, and masonry, window and glass subs

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents