Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

C--Idaho, NIFC & Utah A&E IDIQ
Results
$2,500 to $5,000,000 est. value

C--Idaho, NIFC & Utah A&E IDIQ
Results
$2,500 to $5,000,000 est. value

Architectural and Interior Design Services
New Construction - 91,000 SF
Construction
Salt Lake City, UT

Architectural and Interior Design Services
New Construction - 91,000 SF
Construction
Salt Lake City, UT

Full Service Design IDIQ
New Construction
Design

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Architectural Services - Elementary School Prototype
Construction
Herriman, UT 84096

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Professional Engineering Services
Post-Bid
Sandy, UT

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Last Updated 07/28/2022 12:04 PM
Project Title

RFP Design - Eccles Health Science Library Seismic Upgrade

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84132   (Salt Lake County)
Category(s) Education, Government/Public, Professional Services
Sub-Category(s) Architectural, College/University, Engineering, Library - Public
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The University is seeking an A/E team to provide programming and full design services for the renovation (including seismic upgrade) of the University of Utah Eccles Health Sciences Library (building #589). Multiple phases of design and construction are anticipated depending on the availability of funding. The renovation will be completed over the next several years as a series of separate projects each having its own separate contracts. The University anticipates utilizing a CMGC construction delivery method (with multiple phases/contracts) for the overall renovation. Following announcement of the selection results, the University intends to provide separate contracts to the selected A/E team for the following two projects: Project # 22633, Seismic Upgrade: Full design services for seismic upgrade as outlined in the University of Utah Eccles Health Science Library Seismic Upgrade Feasibility Study (May 18, 2022) Project #22632, Programming: Programming of spaces vacated by programs moving to other buildings. The selection shall be under the Value Based Selection method. The Solicitation for Architects / Engineers document, including the submittal requirements and the selection criteria and schedule, will be available on BidSync. All Questions must be directed to: Nirman Rajbhandari, email: n.rajbhandari@utah.edu , phone: 801-213-1066. Q & A deadline: Aug 09, 2022 6:00:00 PM EDT No pre-submittal meeting is scheduled for this selection process.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Multiple Seating, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents