Similar Projects
Stockbridge-Munsee Health and Wellness Center Floor Coverings Replacement
Renovation
Sub-Bidding
$40,000 CJ est. value
Bowler, WI 54416

Auditorium Concrete Floor Polishing - Ronald Reagan High School
Alteration
Post-Bid
Milwaukee, WI 53221

Ronald Reagan High School - Auditorium Concrete Floor Polishing
Alteration
Post-Bid
Milwaukee, WI 53221

M1QA--Refurbishing of Terrazzo Flooring at the Clement J Zablocki VAMC
Results
Milwaukee, WI 53295

Courthouse - Marble And Terrazzo Floor Repair & Polish
Results
Ellsworth, WI 54011

Cafeteria Floor Repairs
Alteration
Post-Bid
Milwaukee, WI 53207

Refinishing Gymnasium Floors
Term Contract
Results
Siren, WI

AE Burdick Cafeteria Floor Repairs
Alteration
Post-Bid
Milwaukee, WI 53207

Repair Sagging Floor B2875, Fort McCoy WI
Term Contract
Results
$100,000 to $250,000 est. value
Fort McCoy, WI

72--Laminate Wood Flooring Install Sturgeon Bay
Term Contract
Post-Bid
Sturgeon Bay, WI 54235

Newton - Flooring Replacement: GRECC
Term Contract
Results
Madison, WI 53705

Floor Refinishing
Term Contract
Post-Bid
Milwaukee, WI

Lasata Heights Apartments
Renovation, Alteration
Results
Cedarburg, WI 53012

Keefe Avenue Elementary School - Library and Office Flooring Replacement
Alteration
Post-Bid
Milwaukee, WI 53206

Building 3.1 Bid Package Flooring and Gypsum Board Assembly
Alteration
Results
Milwaukee, WI

Last Updated 10/26/2022 11:09 AM
Project Title

Transfer Station Concrete Tip Floor Replacement

Physical Address View project details and contacts
City, State (County) Pardeeville, WI 53954   (Columbia County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $210,438 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 10/05/2022 This project will be awarded on October 13, 2022. Saw cutting and demolition of portions of the existing tip floor, removal of existing equipment (under the tip floor) and providing and installing compacted structural fill, removal of unsuitable soils and providing and installing compacted structural fill, infill of concrete wall openings, and installation of a new tip floor at the Solid Waste facility in Pardeeville, Wisconsin. Any person with a disability requiring special accommodations must contact the County no later than (seven) 7 days prior to the mandatory pre-bid meeting or bid opening.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents