Project Title | Concrete Stairs and Sidewalk Replacement Buildings 3, 10, 11 and Administration Mendota Mental Health Institute Department of Health Services |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53704 (Dane County) |
Category(s) | Medical |
Sub-Category(s) | Hospital |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $248,500 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Concrete Stair Repairs 5 Buildings 3, 10, 11 & Administration 6 Mendota Mental Health Institute All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. In general, the work consists of: reconstruction of the exterior concrete stairs, sidewalks and railings at buildings 3, 10, 11 and the administration building and reconstruction of the pedestrian bridge at the administration building. It will include items such as removals, base aggregate dense, concrete steps, curb and gutter and sidewalk, concrete masonry bridges, pipe railing and asphaltic surface. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. CONSTRUCTION OF NEW STAIRS AND SIDEWALK NEAR BUILDINGS 3, 10, 11, AND 175. AS WELL AS A NEW PEDESTRIAN BRIDGE JUST EAST OF THE ADMINISTRATION BUILDING. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |