Similar Projects
District Asphalt Work
Bidding
Layton, UT

I-15, 2600 South to Pages Ln (NB) Preservation High Volume
Bidding
$3,000,000 to $4,000,000 est. value
UT

Weber State Davis Campus Access Road
Post-Bid
Layton, UT 84041

Lot 4 at Hill AFB into a Fenced Material Storage Area.
Post-Bid
$5,000,000 to $10,000,000 est. value
UT

DDHU Lot 3 Repairs at Hill AFB, UT
Results
$5,000,000 to $10,000,000 est. value
Ogden, UT 84056

1300 North and 1000 West Roundabout Project
Results
$350,000 to $400,000 est. value
Clinton, UT 84015

Construction of the 400 East (Chase Lane to Parrish Lane) - Street Rebuild
Bidding
$450,000 est. value
Centerville, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

Bluff Road; 550 West (on Gentile) to 1000 West Reconstruct and Widening
Results
$3,000,000 to $6,000,000 est. value
UT

DFCM Construction - Pre Qualified Paving - Davis Technical College Drive Paving Project
Bidding
$480,000 est. value
Kaysville, UT

Construction of the 2020 Road Improvement Project
Post-Bid
Syracuse, UT 84075

Construction of the 2020 Chip Seal
Term Contract
Results
Less than $440,000 est. value
Kaysville, UT 84037

1970 South 1200 West Street Construction Project
Bidding
Woods Cross, UT 84087

800 North Roadway Improvements 450 West to 50 West
Post-Bid
$1,736,000 est. value
Clearfield, Sunset, UT

800 North - 2000 West to 3000 West Project
Results
Clinton, UT 84015

Last Updated 01/22/2020 09:45 AM
Project Title

300 North Road Improvement Project

Physical Address View project details and contacts
City, State (County) West Point, UT 84015   (Davis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements consist of: widening the existing roadway, constructing curb & gutter and sidewalks, pulverizing existing asphalt surface and re-establishing crown with new asphalt, and utility improvements. The project consists of improving the roadway between 1000 West and 2000 West. Improvements consist of: widening the existing roadway, constructing curb & gutter and sidewalks, pulverizing existing asphalt surface and re-establishing crown with new asphalt, and utility improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents