Similar Projects
Fire Hydrant Auditing, Inspecting and Testing Services
Term Contract
Bidding
Addison, TX

Water Services
Term Contract
Post-Bid
Cuero, TX 77954

Barker Cypress Road Waterline Loop
Post-Bid
Houston, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Bryson Phase 11 Public Improvement Construction Plans Project 19
Post-Bid
Leonard, TX

Wastewater Facilities Safety and Security Improvements Project
Results
$6,645,900 est. value
Dallas, TX 75201

Imperial Forest Section 5
Post-Bid
Houston, TX

Large Size Meter Replacement
Results
Less than $200,000 est. value
Farmers Branch, TX 75234

Travis Ranch Phase 2K Utility Improvements
Post-Bid
Dallas, TX

Meadowlark 16-Inch Water Main Replacement Project
Results
Less than $1,117,424 est. value
San Antonio, TX 78210

Automated Meter Reading/Advanced Metering Infrastructure System
Infrastructure
Post-Bid
Blue Ridge, TX

Elgin FM 1704 Wastewater Extension
Results
$2,000,000 est. value
Elgin, TX 78621

Water/ Wastewater Utilities Job Order Contract
Infrastructure
Post-Bid
Odessa, TX

Water Line Replacement along Jones Road, Balcrest Drive, Dunbrook Drive and Creektree Drive
Results
Less than $1,387,331 est. value
Houston, TX 77070

Last Updated 12/30/2021 12:44 PM
Project Title

Palestine Railroad Park Waterline Replacement

Physical Address View project details and contacts
City, State (County) Palestine, TX   (Anderson County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of old 6-inch Asbestos concrete water main with 10,000 feet of 6-inch C900, Install one (1) 4-inch meter with vault, Install one (1) 2-inch meter, Install 3 fire hydrants with valves a main, Kill out old main, Tie new 6-inch C900 to all old lines, Install one (1) wet tap 6 X 12 AC pipe, Install 9 valves, Install one 2-inch flush station, and one bore under county road with 1 OO4eet, 10-inch casing. Several creek crossings are present.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents