Similar Projects
Bank of America Redevelopment
New Construction
Conception
Virginia Beach, VA 23451

Parliament Drive Sidewalk Phase I - PG100555 - City of Virginia Beach
Infrastructure
Conception
$729,706 CJ est. value
Virginia Beach, VA 23462

Canterbury On The Bay
New Construction
Design
$25,000,000 est. value
Virginia Beach, VA

Baker Road Apartment Complex
New Construction
Design
$6,100,000 est. value
Virginia Beach, VA 23455

Virginia Aquarium MACC Storage Facility
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Virginia Beach, VA 23451

Underground Storage Tank Removal - Chesapeake-Elizabeth Treatment Plant (CETP)
Infrastructure
Bidding
$20,000 CJ est. value
Virginia Beach, VA 23455

Wawa #8678 / Virginia Beach
New Construction, Infrastructure - 6,049 SF
Post-Bid
$1,600,000 CJ est. value
Virginia Beach, VA 23451

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

27 1/2 Oceanfront High-Rise Apartment Building
New Construction
Construction
$53,908,000 est. value
Virginia Beach, VA 23451

First Landing State Park Bathhouse Renovations
Infrastructure, Renovation
Construction
$200,000 CJ est. value
Virginia Beach, VA 23451

Green Clean Auto Wash
New Construction, Infrastructure - 4,500 SF
Pending Verification
$1,200,000 CJ est. value
Virginia Beach, VA 23452

Friends School Apartments
New Construction
Pending Verification
Virginia Beach, VA 23451

Parliament Drive Sidewalk Phase II - PG100301 - City of Virginia Beach
Infrastructure
Conception
$1,803,725 CJ est. value
Virginia Beach, VA 23462

Last Updated 11/10/2022 05:11 PM
Project Title

Society At Gateway

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23462   (Virginia Beach City County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $123,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 6, 2022, this project is underway.

Details

5 Stories Above Grade, 342,614 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents