Similar Projects
Douglas Street Warehouse
New Construction - 74,520 SF
Conception
Bloomfield, CT

King Street Distribution and Flex Buildings
New Construction - 600,350 SF
Design
Enfield, CT

True Storage
New Construction - 97,366 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Bloomfield, CT 06002

Prefabricated Storage Sheds for the Eli Terry and Philip R. Smith Elementary Schools
New Construction
Post-Bid
South Windsor, CT 06074

Project Mesaiou
New Construction - 796,200 SF
Post-Bid
Windsor, CT

Installation of a Pre-Fabricated Building Fire Training Facility
Results
New Britain, CT 06051

Development Planning Services for the Connecticut Regional Agriculture Market
New Construction
Results
Hartford, CT

Budney Aerospace
New Construction - 60,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Berlin, CT

Distribution Facility
New Construction - 182,000 SF
Construction
$10,000,000 CJ est. value
South Windsor, CT

150 Dividend Road Mixed Use
New Construction - 30,750 SF
Pending Verification
Rocky Hill, CT 06067

BDL Logistics Center
New Construction - 487,200 SF
Design
Windsor, CT 06095

Rehabilitation of Salt Sheds
Results
$500,000 to $999,999 est. value
East Hartford, Rocky Hill, Southington, Windsor, CT 06118

Birken Manufacturing
Addition - 19,208 SF
Construction
$1,200,000 est. value
Bloomfield, CT 06002

25 Talbot Lane
New Construction - 359,640 SF
Design
South Windsor, CT

Rehabilitation of Salt Sheds in the Towns of Barkhamsted and Farmington
Results
$200,000 to $499,999 est. value
Barkhamsted, Farmington, CT

Last Updated 05/05/2022 09:46 AM
Project Title

Warehouse / Manufacturing

Physical Address View project details and contacts
City, State (County) East Hartford, CT 06118   (Hartford County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Warehouse/Storage
Contracting Method Owner to Subcontract.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use.

Details

2,500,000 SF - Manufacturing/Processing Plant, Warehouse/Storage, 2,500,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents