Similar Projects
Steele Street Pump Station Upgrades - City of New Britain
New Construction, Infrastructure
Conception
$450,000 est. value
New Britain, CT 06052

Whites Bridge Pond Station Improvements - City of New Britain
Renovation
Conception
$6,000,000 est. value
New Britain, CT

Route 44 Sanitary Sewer Pump Station Rehabilitation - Town of Avon
Infrastructure
Design
$700,000 CJ est. value
Avon, CT 06001

Red Road Wastewater Pumping station Upgrades
Renovation, Infrastructure
Bidding
$650,000 CJ est. value
Middletown, CT 06457

Construction of Raymark Stormwater Pumping Station, Stratford, Ct
Post-Bid
$10,000,000 to $25,000,000 est. value
Stratford, CT

Goodwin Park Irrigation and Booster Pump Improvements
Infrastructure
Post-Bid
$1,450,000 CJ est. value
Hartford, CT 06114

Wet Well Ventilation Upgrades for Gravel Street Pump Station
Results
Mystic, CT 06355

Vault B6 Pump Station
Results
Storrs, CT

Wastewater Pump Stations Rehabilitation Project
Renovation
Pending Verification
$3,494,950 CJ est. value
Southington, CT 06489

Elmwood Pump Station Upgrade - Town of Cheshire
Infrastructure
Conception
$3,800,000 CJ est. value
Cheshire, CT 06410

Installation of Prefabricated Skid-Mounted Pumping Station
New Construction
Post-Bid
Ledyard, CT 06339

Removal And Disposal Of Grease In Pump Station Wet Wells
Infrastructure
Results
$40,000 est. value
Stamford, CT

Moss Farms Pump Station Upgrade - Town of Cheshire
Infrastructure
Conception
$625,000 CJ est. value
Cheshire, CT 06410

Sandy Hook Wastewater Pumpstation Upgrade
Renovation
Post-Bid
Newtown, CT 06482

Old Norwich and Cross Road Sewer Pump Station Upgrades
Renovation
Results
$600,000 est. value
Waterford, CT

Last Updated 03/25/2023 03:36 AM
Project Title

Deming Road Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Berlin, CT 06037   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,476,595 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of demolition of the existing pump station, installation of submersible pumps in new wetwell, installation of new valve vault and generator, construction of new electrical/control building and all related electrical and instrumentation work as indicated on the Drawings. The work also includes temporary bypass pumping, testing of the bypass piping, and site restoration. Bids shall be on a lump sum basis A bid deposit shall be furnished in accordance with the Instructions to Bidders. Bidders shall be Department of Administrative Services (DAS) pre-qualified under the category of either "Water and Sewer Lines" or "Water Treatment Plants." Bidders are advised that both the DAS Prequalification Certificate and Update (Bid) Statement must accompany the Bid proposal for projects estimated to exceed $500,000 under C.G.S. 4b91 as amended. Failure to supply these forms with the Bid will result in rejection of the Bid. The Project is subject to the prevailing wage laws under Connecticut General Statutes (CGS) 31-53 and 31-53a and is subject to prevailing wage rates as determined by the Connecticut Department of Labor Commissioner. It is the responsibility of the Contractor, before Bid opening, to request if necessary, any additional information on Minimum Wage Rates for those trades people who may be employed for the proposed Work under this Contract. The Town of Berlin is an Affirmative Action/Equal Opportunity Employer; Minority/Women's Business Enterprises are encouraged to respond. The Town reserves the right to amend or terminate this Invitation to Bid, reject all bids, waive any informalities, and award the contract to the bidder that is deemed to be in the best interests of the Town. All questions about the meaning or intent of the Bidding Documents shall be submitted electronically in writing via emailed word documents to: DPC Engineering, LLC Email: bidding@dpcengineering.com In order to receive consideration, questions must be received by Engineer at least five (5) business days prior to the date fixed for the opening of Bids. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda to all parties recorded by Engineer as having received the Bidding Documents not later than two (2) business days prior to the date fixed for the opening of Bids. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents