Similar Projects
Coastal Storm Risk Management Project, Flagler Beach Initial Nourishment 2020, Flagler County, Florida
Design
$10,000,000 to $15,000,000 est. value
Flagler Beach, FL 32136

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Post-Bid
$10,000,000 to $20,000,000 est. value
Miami, FL

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Florida City Canal Outfall and Equalizer Improvements Project
Post-Bid
Less than $989,000 est. value
Miami, FL 33128

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Retention Pond Work Early Education
Renovation
Post-Bid
Panama City, FL

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Jupiter Island Beach Restoration
Post-Bid
Hobe Sound, FL 33455

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Arcola Lakes - Bioretention Area
Post-Bid
Less than $98,000 est. value
Miami, FL 33147

CBJTC Prison Camp Road Washout Repair
Results
Less than $300,000 est. value
Starke, FL 32091

Retention Wall Repairs at Laurel Oaks Reclaimed Water Storage Ponds
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34240

Ten Mile Creek Oxbow Restoration
Results
Fort Pierce, FL

Last Updated 10/18/2021 05:25 AM
Project Title

Drainage Repair - Milton Maintenance - Shldr and Ditch Maintenance

Physical Address View project details and contacts
City, State (County) FL   (Santa Rosa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements under this Site-Specific Contract consist of adding concrete ditch pavement, adding paved shoulder, adding concrete shoulder, removing riprap, removing and replacing damaged concrete ditch, removing and replacing buried pipe, installing new buried pipe, removing bag riprap headwalls, installing new headwall, and restoring all disturbed areas, and associated incidental work to prevent erosion and to restore and preserve maximum drainage functionality along a portion of SR 10 (US Hwy 90) at Mile Post 8.0165 in the Pea Ridge area and SR 10 at Mile Post 11.722 in the Milton area of Santa Rosa County, as shown in the Appendices. All work will be confined to the southern right of way of SR 10 between Sheffield Drive and Trice Road, and between Susan Street and Mary Street. Section 0001 Asphalt Repair (Manual) (Tn) 0110- 4- 10 Removal Of Existing Concrete Sy 187.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 634.600 0121- 70- 2 Flowable Fill, Maintenance Contracts Only Cy 1.000 0339- 1- Miscellaneous Asphalt Pavement Tn 28.100 0400- 32- Concrete For Joint Repair Cy 1.300 0430-175-124 Pipe Culvert,Optional Material,Round, 24"S/Cd Lf 360.000 0430-524-200 Straight Concrete Endwalls, 24", Double, 0 Degrees, Round Ea 1.000 0524- 1- 2 Concrete Ditch Pavement, Non Reinforced, 4" Sy 751.000 0530- 3- 4 Riprap, Rubble, F&I, Ditch Lining Tn 50.000 E110- 70- Removal Of Flexible Pavement Sy 104.000 E575- 1- Sodding Sy 959.000

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents