Similar Projects
SOB and HOB, HVAC Cleaning
Post-Bid
Tallahassee, FL

Bryant Building Chiller and Boiler Replacement
Post-Bid
Tallahassee, FL 32399

FDOT HVAC Install: Sneads WB Weigh Station
Results

On-Call HVAC Services
Results
Tallahassee, FL 32312

Capitol Complex Window/HVAC Replacement
Post-Bid
Less than $36,000,000 est. value
Tallahassee, FL 32399

Florida Geological Survey - HVAC Replacement
Results
Less than $227,480 est. value
Tallahassee, FL 32303

Doyle Conner Lab Administration Building Air Distribution Improvements
Post-Bid
Tallahassee, FL 32399

FSU Facilities Boiler PM and Minor Repair Services
Results
Tallahassee, FL 32306

Florida A and M University Lab 152 Remodel - Fume Hood Installation
Post-Bid
Tallahassee, FL 32310

FSU Facilities Chiller PM and Minor Repairs Services
Results
Tallahassee, FL 32306

HVAC and Mechanical Products
Term Contract
Post-Bid

FSU Facilities and FSU Mag/Lab HVAC PM and Minor Repairs Services
Results
Tallahassee, FL

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Title and Land Records Vault HVAC System Replacement
Results
Less than $66,591 est. value
Tallahassee, FL 32303

FSU Keen Building HVAC Basement Replacement
Results
Tallahassee, FL 32306

Reported 07/10/2020 12:00 AM
Project Title

Doyle Conner Administration Building HVAC Improvements

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32399   (Leon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from Construction Manager - 06/19/20
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of HVAC and electrical improvements to the Doyle Conner Administration Building. Improvements are proposed on the basement, first floor, second floor and roof levels of the existing facility. The scope of work includes replacement of failing mechanical equipment, air handling units, VAV air terminal units, variable frequency drives, ductwork, diffusers, controls updates and HVAC associated plumbing and electrical modifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents