Similar Projects
Cole Road to South Ricardo to North Ricardo to Anzar Road - PWB-2105 - San Benito County
Infrastructure
Conception
$674,844 CJ est. value
Aromas, CA 95004

Limekiln Road Bridge Over Pescadero Creek - RF 08-662 - San Benito County
Demolition, New Construction, Infrastructure
Conception
$463,125 CJ est. value
Hollister, CA 95023

Install Beautification, Transportation Art, and Safety Measure Enhancement Project in Caltrans R/W
Infrastructure
Design
$1,010,000 CJ est. value
Pinnacles, CA 95043

Widen
Infrastructure
Design
$8,156,000 CJ est. value
Pinnacles, CA 95043

Construction Mac; Pacnorwest
New Construction, Renovation
Post-Bid
$100,000 to $3,500,000 est. value

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for New Construction, Renovation, and Repair of General Building Construction at Various Government Installations
New Construction, Renovation
Post-Bid

Felipe Nine
New Construction, Infrastructure - 337,710 SF
Pending Verification
$118,000,000 CJ est. value
Hollister, CA 95023

Cienega Road Bridge at Bird Creek Replacement - San Benito County
Demolition, New Construction, Infrastructure
Conception
$240,000 CJ est. value
Hollister, CA 95023

Install Beautification, Transportation Art, and Safety Measure Enhancement
Infrastructure
Design
$755,000 CJ est. value
San Juan Bautista, CA 95045

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Cienega Road - Mudstone Ranch to Bird Creek - San Benito County
Infrastructure
Conception
$807,790 CJ est. value
Hollister, CA 95023

Install Beautification, Transportation Art, and Safety Measure Enhancement
Infrastructure
Design
$968,000 CJ est. value
San Juan Bautista, CA 95045

IDIQ MACC Small Business Set-Aside for New Construction, Renovation, and Repair of Dry Utilities Construction Projects at Various Government Installations In CA, AZ, NV, UT, CO, and NM
New Construction, Renovation, Term Contract
Post-Bid
$300,000 to $20,000,000 est. value

Fairview Road/Fallon Road Traffic Signal Intersection - San Benito County
Infrastructure
Conception
$1,343,500 CJ est. value
Hollister, CA 95023

Sunnyside Park Development (Park Development Fund) - San Benito County
Infrastructure
Design
$800,000 CJ est. value
Hollister, CA 95023

Last Updated 09/28/2022 01:44 AM
Project Title

Maintenance Yard Improvement Project

Physical Address View project details and contacts
City, State (County) Hollister, CA 95023   (San Benito County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2020 , Construction documents
Bids Due View project details and contacts
Estimated Value $459,435 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed includes, but is not necessarily limited to: the installation of a restroom and locker facility with associated utilities on the maintenance yard site and improvements to the existing pavements. The last date and time to submit questions or request for information regarding this project is set at 2:00 PM July 16, 2020 . Questions must be received prior to this time and date by fax (831) 634-4913, letter, or e-mail at Sarah.Lujan@Kimley-Horn.com. All questions received after this date and time will not be answered. Project Contact: Mike Chambless City of Hollister Management 375 Fifth Street Hollister, CA 95023 Tel:(831) 636-4365 Fax:(831) 636-4366 mike.chambless@hollister.ca.gov Project Duration: 240 Calendar Days Liquidated Damages: $100,000.00 Per Calendar Day

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents