Similar Projects
Provide Services for the Current Jefferson Parish Scada System
Term Contract
Conception
Gretna, LA 70053

RFQ - Provide Routine Engineering Services for Sewer Projects
Term Contract
Conception
Kenner, LA 70065

George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Design
$300,000 CJ est. value
New Orleans, LA 70118

George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Design
$300,000 CJ est. value
New Orleans, LA 70118

Recreation Center New Play Structure
Renovation
Post-Bid
$291,129 est. value
New Orleans, LA

Three 30 Pratt Type Xr-70 150B Butterfly Valves
Infrastructure
Post-Bid
Gretna, LA

Install New Tot Lot Play Structures Including Slab, Structures and Safety Surface
New Construction
Results
Less than $250,000 est. value
Gretna, LA

John Hopkins Sewer Force Main Replacement
Infrastructure
Results
$707,900 est. value
Kenner, LA

Service Station
Addition, Demolition, Infrastructure, Renovation
Pending Verification
$500,000 CJ est. value
Marrero, LA 70072

Treasure Chest Casino Expansion
New Construction, Infrastructure - 57,000 SF
Pending Verification
$100,000,000 CJ est. value
Kenner, LA 70062

RFQ Design - Rehabilitation of the Transcontinental and Belle Lift Station
Renovation
Conception
$75,000 CJ est. value
Kenner, LA 70065

Harold Gene Devore Playground
Infrastructure
Design
$230,000 CJ est. value
New Orleans, LA 70114

New Batting Cage at the Martin Luther King Playground
Renovation, Infrastructure
Post-Bid
Less than $250,000 est. value
Harvey, LA 70058

On-Call Water Valve Operation Services
Infrastructure
Results
New Orleans, LA

RFQ - Professional Engineering and Supplemental Services Drainage Wb
Term Contract
Conception
Kenner, LA 70065

Last Updated 12/22/2022 09:31 AM
Project Title

Pump Intake Repairs (Re-Bid)

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70131   (Orleans County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of December 22, 2022, no bids received. As of this time it is unknown if and when project will rebid.** Project Location: Brechtel Memorial Park, 4401 Lennox Blvd, New Orleans, LA 70131 The Work of Project is defined by the Contract Documents and consists of the following: 1. This project consists of the extension of the existing canal intake pipe and installation of an intake filtering device, secured within a pre-cast concrete wet well or junction box to provide a reliable source of water for intake pump operations. 2. Project includes checking the operation of, cleaning and repairing as needed the existing pump system and housing to allow resumption of full-time pump operation; clearing sediment basin of debris and organic material; clearing submerged drain line in bed system and resetting clean out covers as necessary; clearing pipe under roadway for unimpeded water flow; and, checking outflow area for signs of erosion which are to be mitigated by replanting iris or turf grass. 3. During the bidding process, Contractor to visit site and verify site conditions as necessary to execute the Work per the Drawings and the Specifications. 4. Tree protection specifications and original construction drawings are being provided for reference; coordinate with Owner Representatives unless otherwise directed. 5. Contractor to verify existing conditions before submitting the bid. Type of Contract: Project will be constructed under a single prime contract. The Contractor also Version: October 2021 - Purchasing/JPM guarantees completion of this contract within the number of calendar days shown below and any approved extensions from the date of the "Notice to Proceed". Calendar Days 90 Days A bid bond or security in an amount not less than $100 or five percent (5%) of bid amount, conditioned on the bidder's failure to execute a contract with the City to supply the specified goods or services. Bidders shall provide bid security in the form of a bid bond, cashier's check or certified check (as per R.S. 38:2218) in the amount of (see above) of the bid price (Base Bid and any Alternates) the City will accept a cashier's check, certified check or satisfactory bid bond payable to the City All non-public works contracts have a default goal of 35% DBE participation

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents