Similar Projects
Civic Center Remodel
Renovation - 9,377 SF
Conception
$1,100,000 est. value
Paducah, KY 42001

Lexington Community Land Trust Center
New Construction - 3,500 SF
Conception
$500,000 to $1,000,000 CJ est. value
Lexington, KY 40507

Region 4 Indefinite Delivery/Indefinite Quantity (Idiq), Multiple Award Task Order Contracts (Matoc), For Construction Services In The States of Tennessee and Kentucky
New Construction
Design
$250,000 to $50,000,000 est. value

Region 4 Indefinite Delivery/Indefinite Quantity (Idiq), Multiple Award Task Order Contracts (Matoc), For Construction Services In The States of Tennessee and Kentucky
New Construction
Design
$250,000 to $50,000,000 est. value

Construction Estill County - Estill County Fiscal Court
New Construction
Conception
$15,655,000 est. value
Irvine, KY 40336

$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Construct Greenhouse Complex - University of Kentucky
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
Lexington, KY 40508

Two Electrical Pedestals
Infrastructure
Design
$200,000 CJ est. value
Frankfort, KY 40601

Government Center Annex HVAC - City of Lexington
Renovation
Conception
$582,200 CJ est. value
Lexington, KY 40507

Construct Agriculture Federal Research Facility 1 - University of Kentucky
New Construction, Infrastructure
Conception
$80,000,000 CJ est. value
Lexington, KY 40508

Last Updated 03/27/2023 04:07 PM
Project Title

GB Butler Turpin Roof Replace - East

Physical Address View project details and contacts
City, State (County) Carrollton, KY 41008   (Carroll County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $188,505 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The following list of proposed subcontractors is required by the owner to be executed, completed, and submitted with the Bidders Proposal. All subcontractors are subject to approval by the Division of Engineering and Contract Administration, Department of Facilities and Support Services, Frankfort, Kentucky. Failure to submit this list, completely filled out, may result in bid rejection. If certain branches of work are to be done by the Prime Contractor, so state. Review/evaluation of subcontractors will occur on the bid opening day. If the Commonwealth requests replacement of a subcontractor, on bid opening day, then the apparent low bidder will provide a replacement subcontractor prior to close of the Commonwealths business day on that day. Failure of the apparent low bidder to comply with the preceding sentence may result in bid rejection. If subcontractor review/evaluation is not completed on the bid opening day, then procedures for any replacement will be issued based on the uniqueness of each situation. The responsibility for selection, offering of qualified, competent subcontractors to accomplish the work intended is solely the responsibility of the bidder to the Commonwealth

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents