Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Design Build, Replace CLC Hospice Transformer Copper Windings
Term Contract
Design
West Palm Beach, FL 33410

Palm Beach International Airport Switchgear NPDS Replacement
Renovation
Bidding
West Palm Beach, FL 33415

Community Solar Power Program
Alteration
Bidding
Lake Worth, FL

Town-Wide Overhead Utility Undergrounding Project - Phase 6, South And North (Formerly Phase 5)
Alteration
Sub-Bidding
Palm Beach, FL

Central Plant Chiller Removal and Replacement work at Main Detention Center
Renovation
Sub-Bidding
West Palm Beach, FL 33406

Annual Contract - Low Voltage
Term Contract
Post-Bid
West Palm Beach, FL 33411

Pahokee Radio Tower - Generator Replacement
Term Contract
Post-Bid
Less than $170,000 est. value
Pahokee, FL 33476

Water Reclamation Facility Lighting and Lightning Protection Replacement
Results
West Palm Beach, FL 33414

13KV Electrical Infrastructure Modifications
Results
Boca Raton, FL

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Lift Station 291 Emergency Generator
Results
Jupiter, FL 33458

GCC - Transfer Switch Disconnects Replacement
Term Contract
Post-Bid
West Palm Beach, FL 33401

Fire Station 51 - Generator Replacement
Term Contract
Results
$200,000 est. value
Boca Raton, FL 33428

PBIA SMC08 Building 846 Uninterruptible Power System (UPS) Replacement
Post-Bid
Palm Beach, FL

Reported 03/16/2022 12:00 AM
Project Title

S-2, S-3, S-4, S-7, and S-8 Monitoring Panels Replacement

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33411   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project comprises of replacing all the existing monitoring panels for the S-2, S-3, S-4, S-7, and S-8 pump stations and install new equipment from Fairbanks Morse to implement new shutdown triggers

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents