Similar Projects
World-Wide Water Storage Tank Remediation
Term Contract
Results

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Village of Alfred WWTP Improvements
Renovation
Results
$350,000 to $1,150,000 est. value
Alfred, NY 14802

SUNY Alfred Campus-Wide Utility Improvements - Loop Road and Utility Improvements
Infrastructure
Results
$20,000,000 to $25,000,000 est. value
Alfred, NY 14802

Water System Improvements
Infrastructure
Results
$3,000,000 est. value
Fillmore, NY 14735

Water System Improvements, Contract 1 - Pine Hill Water Main Replacement
Infrastructure
Results
$400,000 est. value
Alfred, NY 14802

Bolivar Richburg CSD - 2021 Capital Improvements Project - Phase 2 - SiteWork
Infrastructure
Results
$190,000 est. value
Bolivar, NY 14715

2021 Capital Improvements Project (Phase 1) - Site Construction
Infrastructure
Results
$190,000 est. value
Bolivar, NY 14715

OYA Independence North & East Solar Farms
New Construction, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Independence, NY 14895

Culvert - Repair / Cleaning - I-86, SR13, 228, 230, 243, 248, 275 & 417
Infrastructure
Results
$1,211,650 CJ est. value
Angelica, NY 14709

NY 417 MBC Paving - Wellsville Arterial
Infrastructure
Design
$1,550,000 CJ est. value
Wellsville, NY 14895

NY 417 MBC Paving - Wellsville Arterial
Infrastructure
Design
$1,550,000 CJ est. value
Wellsville, NY 14895

E. Hughes St. / County Road 26 Bridge over Genesee River, BIN 3330740 Phase 1, Bridge Removal
Infrastructure
Bidding
$200,000 CJ est. value
Angelica, NY 14709

SCIO Central School 2022 ESSER - Playground - Site Construction Work
Infrastructure
Bidding
$700,000 CJ est. value
Scio, NY 14880

Small Culvert Relining
Infrastructure
Bidding
$1,350,000 CJ est. value
Angelica, NY 14709

Last Updated 11/16/2022 04:04 PM
Project Title

Campus-Wide Utility Improvements - Water Treatment Building and Elevated Storage Tank

Physical Address View project details and contacts
City, State (County) Alfred, NY 14802   (Allegany County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $7,534,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project No-190.800.000, 190.800.001 The Fund's project specific goals for this project are 5% MBE and 5% WBE and 3% SDV The work of this single bid project includes construction of a new water treatment building, new elevated concrete water storage tank, and new pre-chlorination building. Replace underground utilities and structures, an provide regrading, concrete pavement, asphalt pavement, and plantings. All bidders must present evidence of skill, experience and financial qualifications per Information to Bidders, Section 7 of the project specs. Subcontracting is permitted (Section 2.18 of SUCF Agreement). Principal subcontractors must be named within 48 hrs after bid opening per Information for Bidders Section 8. Bidders must submit within 48 hrs either certification of its NYS VendRep questionnaire (preferred) or a signed and notarized paper CCA2 form (Version 9/13 only), Attachments A, B, and C, Appendix A form, work descriptions, and preliminary project schedule. In accordance with State Finance Law 139-j, all non-technical inquiries regarding this procurement must be directed to Robbilee Luedtke at SUCF.ConstructionBids@suny.edu or for MWBE related issues, Scott Clay at SUCF.OpportunityAdmin@suny.edu . Contact made to other staff regarding this procurement may disqualify the firm and affect future procurements with government entities in the State of New York. EEO goals for this project: 6% minority workforce and 3% female workforce Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 5% Women Owned Sub-Contracting Goal: 5% Service-Disabled Veteran-Owned Business Contracting Goal: 3% ontract term: 390 calendar days after receipt of the Notice to Proceed County(ies): Allegany Location: Work will be performed at SUNY Alfred State. Bids will be opened at SUCF offices in Albany, NY. Business entities awarded an identical or substantially similar procurement contract within the past five years: None The work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the construction of SUCF Project No 221013-00 titled Campus-Wide Utility Improvements - Water Treatment Building and Elevated Storage Tank and carrying out all of the duties and obligations imposed upon the Contractor by the Contract Documents. The main features of the work shall include, but not be limited to the following: a. General construction work shall include: a. Construction of new buildings: i. Water treatment building ii. Pre-chlorination building b. Construction of an 850,000-gallon water storage tank c. Construction of underground utilities and structures including: i. Storm Sewer ii. Sanitary Sewer iii. Potable Water Distribution d. Connection of utilities to the new water treatment building, new water storage tank, new chemical feed building, and to site utility tie in locations as shown in the drawings. e. Site regrading f. Asphalt paving g. Site furnishings h. Landscaping, trees, plantings b. Electrical work shall include: a. Permeant electric service including all related site work. b. Emergency generator installation and related work c. Power distribution panels and equipment. d. Electric power and control wiring for building systems. e. Electric power and control wiring for all process equipment, instrumentation, HVAC equipment and accessories. f. Light fixtures and associated wiring. g. Underground conduit and cable installation h. Misc. power as shown on the drawings c. Mechanical work shall include: a. Fans b. Unit Heaters c. Louvers d. Duct work e. Associated controls d. Plumbing work shall include: a. Floor drain and drain piping

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents