Similar Projects
Dove Valley Water Line
Infrastructure
Bidding
$2,500,000 est. value
Scottsdale, AZ 85268

Construction Manager at Risk (CMAR) Services for Dobson Road and Chandler Boulevard Intersection Sewer Improvements
Infrastructure
Bidding
$3,000,000 to $4,000,000 est. value
Chandler, AZ 85224

Cotton Lane RV Resort Off Site Water Plans
Post-Bid
Goodyear, AZ 85338

Right-of-Way General Construction
Post-Bid
Phoenix, AZ 85003

Water Treatment Services and Maintenance
Results
Gilbert, AZ 85295

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Public Housing Pipe Lining
Post-Bid
Chandler, AZ 85225

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Small Water Meter Installation, Repair and Consulting Services
Post-Bid
Chandler, AZ

Sanitary Sewer Repair and Replacement
Results
$111,357 est. value
Guadalupe, AZ 85283

Water/Wastewater Pumps (Sales, Service and Repairs)
Term Contract
Post-Bid
Mesa, AZ 85210

Remote Telemetry Units Replacement Phase 6
Results
Phoenix, AZ

Grease Trap Cleaning Services
Post-Bid
Peoria, AZ

Water Main Replacement Program Right-of-Way
Term Contract
Results
Phoenix, AZ 85003

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Last Updated 10/22/2021 01:55 PM
Project Title

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Chandler, AZ 85225   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

There was a potable water pipeline break in the northeast quadrant of the Price Road/Loop 202 interchange in February 2018. In the aftermath effort of cleaning up the damage and performing repairs, the existing condition of two large diameter pipelines were discovered to require remediation. There is a 30-inch diameter potable water pipeline crossing the Loop 202 freeway and a 36-inch diameter potable water pipeline crossing the Price Road freeway, constructed between 2002 and 2006 by the Arizona Department of Transportation (ADOT). Both pipelines are the material type of concrete cylinder pipe (CCP) and specifically Bar-Wrapped Pipe (BWP) or AWWA C303 Bar-Wrapped Steel Cylinder Concrete Pressure Pipe.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents