Similar Projects
Petco
Renovation
Conception
Rochester Hills, MI 48307

Limestone Workshop & Retail
New Construction - 6,242 SF
Conception
$500,000 est. value
Pontiac, MI

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

RH Store (Restoration Hardware)
New Construction, Demolition - 54,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Birmingham, MI 48009

Madison Reed
Renovation - 2,065 SF
Bidding
Rochester Hills, MI

Skechers
Renovation - 6,590 SF
Bidding
Novi, MI 48375

Total Wine & More #2602
Build-Out - 27,983 SF
Post-Bid
Novi, MI 48375

Max Mara
Renovation - 2,771 SF
Post-Bid
Troy, MI 48084

Griffin Project - Mixed Use Development
New Construction - 117,347 SF
Construction
$65,000,000 est. value
Royal Oak, MI 48067

Varsity Shop Redevelopment
New Construction, Demolition - 27,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Birmingham, MI 48009

Marijuana Retail Facility
Renovation - 13,004 SF
Pending Verification
Royal Oak, MI 48067

Marathon Gas Station - Addition and Renovation
Renovation, Addition - 2,290 SF
Pending Verification
Commerce Township, MI 48382

Residences at Cass Lake
New Construction, Demolition - 145,559 SF
Design
$10,000,000 CJ est. value
Keego Harbor, MI 48320

Dollar Tree #09057
Renovation
Bidding
Waterford, MI 48328

Menards - Gate Canopy Third Lane Addition
Addition - 600 SF
Post-Bid
Wixom, MI 48393

Reported 11/24/2021 12:00 AM
Project Title

GAP Store: Refresh

Physical Address View project details and contacts
City, State (County) Auburn Hills, MI 48326   (Oakland County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method General Contractor to Subcontract by Invitation Only.
Project Status Sub-Bidding, Construction Start Expected January 2022, Construction Completion Expected January 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, 1 Story Above Grade, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 11 - Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents