Similar Projects
Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI
Renovation
Design
$10,000,000 to $25,000,000 est. value
Sault Sainte Marie, MI

Milham Park Dam Removal
Bidding
Kalamazoo, MI

MacArthur Lock Tainter Valve Machinery Replacement
Post-Bid
$5,000,000 to $10,000,000 est. value
Sault Sainte Marie, MI 49783

Sault Visitor Center Lock Operator Exhibit
Post-Bid
Sault Sainte Marie, MI

Ford Fieldhouse Tunnel Repairs
Results
Grand Rapids, MI

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Gull Lake Dam Improvements
Renovation
Post-Bid
Grand Rapids, MI

2020 Chappel Dam Improvements
Results
Gladwin, MI 48624

Flat Rock Dam Boom Installation
Post-Bid
Brighton, MI

Eden Dam Modifications and Stabilization Measures
Results
MI

Upstream Approach Wall Construction for the Soo Lock Complex, Sault Ste. Marie, MI.
Post-Bid
$100,000,000 to $250,000,000 est. value
Sault Sainte Marie, MI

Perrin Dam Improvements
Results
Marshall, MI

New Lock at the Soo Chamber Construction
Post-Bid
$500,000,000 to $800,000,000 est. value
Sault Sainte Marie, MI 49783

Project Labor Agreement for Construction of New Soo Lock Chamber
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

High Temperature Hot Water Replacement to Hill House
Post-Bid
Rochester, MI 48316

Last Updated 11/24/2020 12:09 PM
Project Title

Union Street Dam Fish Pass

Physical Address View project details and contacts
City, State (County) Traverse City, MI 49684   (Grand Traverse County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the work is the modification of the Union Street Dam including demolition of the existing dam structures and appurtenances, construction of new weirs, bypass channel, fish-sorting channels, research building, pedestrian bride, park areas, and restoration after construction. The work generally includes, but is not limited to concrete removal, removal and disposal of fill/sediment materials, construction of the bypass and fish-sorting channels, construction of instream habitat including channel bed material and boulders, construction of shown bridges/buildings and park features, and restoration of the river bank and other disturbed areas within the project limits. This work will be conducted while the contractor actively manages water levels on the Boardman River and flow over/through the Union Street dam within the constraints specified in the drawings and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents