Similar Projects
New Hickory Campus Building Renovation
Renovation - 225,800 SF
Conception
Hickory, NC 28601

Taylor Theatre Infrastructure Renovation
Renovation
Conception
Greensboro, NC

Main, Powell and Gee Buildings Renovations
Renovation - 42,500 SF
Design
$42,000,000 est. value
Graham, NC 27253

Tate + Gate Cultural Arts Center
New Construction - 20,000 SF
Design
Greensboro, NC 27403

UNC School of the Art - Gray Building - Roof Replacement, Envelope Repairs, HVAC, & Fire Suppression Upgrades
Renovation
Bidding
$3,500,000 CJ est. value
Winston Salem, NC 27127

McNair Hall Exterior Canopies
Renovation
Bidding
$400,000 CJ est. value
Greensboro, NC 27401

Design-Build Construction Trades Solution Center
New Construction - 30,000 SF
Post-Bid
$6,000,000 est. value
Morganton, NC

North Carolina Central University Collaborative Learning and Research Center
New Construction, Infrastructure - 4,900 SF
Post-Bid
$3,000,000 CJ est. value
Durham, NC 27707

UNCG - the Arts Place at Tate and Gate
New Construction, Demolition - 20,000 SF
Results
$10,330,306 est. value
Greensboro, NC 27403

UNCC - Student Government Office Renovations
Renovation
Results
Charlotte, NC

NCCU - New School of Business
New Construction - 75,000 SF
Construction
$30,000,000 est. value
Durham, NC 27701

College of the Albemarle Dare Campus Phase #3
New Construction - 36,500 SF
Construction
Manteo, NC

Montreat College Mcleod Hall
Renovation - 3,715 SF
Pending Verification
Montreat, NC 28757

Thales Academy
New Construction
Pending Verification
New Bern, NC

New Student Center
New Construction - 25,000 SF
Conception
$11,000,000 est. value
Shelby, NC 28152

Last Updated 04/27/2023 05:16 PM
Project Title

Salem College - Clewell Hall Bathroom Renovation

Physical Address View project details and contacts
City, State (County) Winston Salem, NC 27101   (Forsyth County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

The Clewell Bathroom Renovation generally consists of the interior demolition and renovation of three floors of existing bathrooms. The renovation can start work mid-May as soon as the residences have vacated the building. The work must be complete mid-August for occupancy. The Health Leadership Lab is a renovation of several offices in the Main Hall. Construction can begin shortly after exams are complete and the occupants have vacated the offices. The goal is to have the majority of the work completed by mid-August, but the College anticipates that punch list work and final touch-ups may extend past August.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents