Similar Projects
Lincoln Ave Rehabilitation - California To Silverado - City Of Napa
Alteration
Conception
$2,500,000 est. value
Napa, CA 94559

Hennessey Treatment Plant Paving Improvements - WQ23UT07 - City of Napa
Infrastructure
Conception
$250,000 est. value
Napa, CA 94558

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Smittle Creek Trail Bridges
Infrastructure
Design
$2,000,000 CJ est. value
Napa, CA 94558

Sanitary Sewer Manhole Adjustment Project Phase XII
Infrastructure
Bidding
$275,000 CJ est. value
Napa, CA 94558

2022 Bridge Repairs Project
Infrastructure
Bidding
$400,000 CJ est. value
Napa, CA 94558

Silverado Trail Striping
Infrastructure
Sub-Bidding
$750,000 CJ est. value
Napa, CA 94558

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Silverado Trail Phase L Paving
Infrastructure
Results
$1,400,000 est. value
Napa, CA 94558

Cold Plane AC, Place HMA (TYPE A) and RHMA-G
Infrastructure
Results
$8,600,000 est. value
CA

Alta East Subdivision
New Construction
Pending Verification
Napa, CA 94559

Napa Cove Affordable Apartments
New Construction
Pending Verification
$36,445,998 est. value
American Canyon, CA 94503

Park Ave and El Centro Highway Crossings Construction - WD25UT03 - City of Napa
Infrastructure
Conception
$1,000,000 est. value
Napa, CA

Silverado Terrace
New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Calistoga, CA 94515

Last Updated 08/10/2022 02:02 PM
Project Title

Napa Creek Condominiums

Physical Address View project details and contacts
City, State (County) Napa, CA 94559   (Napa County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $18,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 10, 2022, no applications have been submitted for building permits. An architect has been selected; however, a general contractor or selection method is not disclosed. This project went before the Planning Commission on July 7, 2022 for Request for a third and final, two-year extension of a previously approved Tentative Subdivision Map, Use Permit, Variance, and Design Review Permit. A timeline for construction has yet to be announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 48 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents