Reported 11/17/2020 12:00 AM
Project Title

Still Creek Culvert Improvement

Physical Address View project details and contacts
City, State (County) Bryan, TX 77803   (Brazos County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes several drainage, utility, and roadway improvements at the following locations: At Woodville Road, the installation of reinforced concrete box culverts as well as replacing existing sanitary sewer. At Charleston Street, a drainage swale between Northside Drive and Emerald Drive. At Staunton Drive, the installation of reinforced concrete box culverts as well as replacing existing sanitary sewer and water line. At Southside Drive, the installation of reinforced concrete box culverts, a new bypass drainage channel, as well as replacing existing sanitary sewer and water line. At Wilkes Street, the installation of reinforced concrete box culverts as well as replacing existing water line. Along Missouri Avenue, the closing and removal of roadway crossing the creek (removing the box culvert to create an open channel), the extension of roadway between Wilkes Street and Yellowstone Drive, and the replacement of existing water line. Detention improvements within the park adjacent to Oklahoma Avenue. At Alabama Avenue and McHaney Drive, the replacement of an existing drainage culvert. In Bonham Park, the installation of an earth berm.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents