Similar Projects
Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Willmore Park - City of St. Louis
Infrastructure
Conception
$1,100,415 CJ est. value
Saint Louis, MO 63109

Locust Street Mass Timber Apartment Building
New Construction, Infrastructure
Design
$110,000,000 CJ est. value
Saint Louis, MO 63103

Locust Street Mass Timber Apartment Building
New Construction, Infrastructure
Design
$110,000,000 CJ est. value
Saint Louis, MO 63103

California Gardens Security Fence and Stair Repairs
Infrastructure, Renovation
Bidding
$100,000 CJ est. value
Saint Louis, MO 63118

Webster Groves Trunk E Sanitary Rehabilitation and I/I Reduction Phase IV Part 3
Infrastructure
Bidding
$496,486 CJ est. value
Saint Louis, MO 63103

Cherokee Street Love Bank Park Redevelopment
New Construction, Infrastructure - 1,067 SF
Sub-Bidding
$1,000,000 CJ est. value
Saint Louis, MO 63118

Cherokee Street Love Bank Park Redevelopment
New Construction, Infrastructure - 1,067 SF
Sub-Bidding
$1,000,000 CJ est. value
Saint Louis, MO 63118

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Land Reutilization Authority Redevelopment Proposals
Infrastructure
Post-Bid
Saint Louis, MO 63107

Police Precinct 1 - St. Louis County - Rebid
New Construction, Infrastructure - 17,224 SF
Results
$9,526,000 CJ est. value
Saint Louis, MO 63103

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Results
$711,651,970 CJ est. value
Saint Louis, MO 63107

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

Puttshack - City Foundry / Saint Louis
Demolition, Infrastructure, Build-out - 25,000 SF
Construction
$5,000,000 CJ est. value
Saint Louis, MO 63110

The Flats at Forest Park
Demolition, New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Saint Louis, MO 63108

Last Updated 12/12/2022 08:48 AM
Project Title

2 Bridge Rehabilitations

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63115   (Saint Louis City County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,706,766 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6I3326 Route I-70 ST LOUIS County. 2 Bridge rehabilitations on McDonnell Boulevard and Lambert International Boulevard, the total length of improvement being 0.54 miles. Range: 1M to 2.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - F01 - 2 Bridge Rehabilitations *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents