Similar Projects
Annular Steel Culvert
Term Contract
Bidding
Boulder, CO

North Cow Creek Culvert
Bidding
Steamboat Springs, CO

SH 103 Culvert Replacement
Post-Bid
Idaho Springs, CO 80452

Detention Ponds Improvement Project
Post-Bid
Golden, CO

2019 Bayfield Culvert Repair
Results
$200,000 to $300,000 est. value
Bayfield, CO 81122

Embankment Material
Results
CO

Middle Cow Creek Culvert
Bidding
Steamboat Springs, CO

Constructing Two Extended Detention Basins, Trenching, and Drainage Pipe
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Installs Soldier Piles and Reinforced Facing Along A Cantilevered Concrete Retaining Wall That Was Undermined From North Clearcreek Scour
Results
Less than $1,000,000 est. value
CO

2021 Ditch Cleaning Project
Bidding
Gunnison, CO

Sterling Ranch Middle Fork Street
New Construction
Post-Bid
Highlands Ranch, CO

Culvert Relining (Spray-Applied)
Results
Less than $1,000,000 est. value
CO

Design Services for Cherry Creek Reservoir Shoreline Stabilization ESS and Tl PRFS
Bidding
CO

2020 Culvert Pipe Maintenance Services
Term Contract
Post-Bid
Brighton, CO 80601

Suckla #1 Reclamation
Results
Less than $25,000 est. value
Naturita, CO 81422

Last Updated 03/31/2021 11:02 AM
Project Title

Eagle Brook Meadows Second Subdivision - Public Infrastructure

Physical Address View project details and contacts
City, State (County) Loveland, CO   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,525,807
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes traffic control, construction staking, erosion control, earthwork, potable water, underdrain, sanitary sewer, storm sewer, concrete curb & gutter, sidewalk, asphalt paving, striping, signage, irrigation, landscaping and all related work incidental to the completion of the project as per the acceptance requirements of Eagle Brook Meadows Metropolitan District No. 1 and City of Loveland. The project is generally located southwest of 57th Street and Taft Avenue in Loveland, CO.

Details

Division 10 - Specialties, Signage.
Division 22 - Plumbing, Facility Sanitary Sewerage, Facility Storm Drainage.
Division 31 - Earthwork, Earth Stripping and Stockpiling, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation.
Division 33 - Utilities, Storm Drainage Utilities, Subdrainage, Subdrainage Piping, Pipe Underdrains, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping, Potable Water Process Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents