Similar Projects
West Lane Bridge Slope Repair - City of Stockton
Alteration
Conception
$480,000 est. value
Stockton, CA 95214

Aurora Street Over Mormon Slough Bridge - WT22035 - City of Stockton
Alteration
Conception
$347,000 est. value
Stockton, CA 95202

Tracy Assisted Living and Memory Care
New Construction, Infrastructure - 84,000 SF
Design
$22,500,000 CJ est. value
Tracy, CA 95376

Manteca Self Storage Project
New Construction, Infrastructure - 123,357 SF
Design
$13,000,000 CJ est. value
Manteca, CA 95337

RFQ Contractor - Department of Veterans Affairs Palo Alto Health Care System, Livermore Phase A
New Construction, Infrastructure - 112,000 SF
Bidding
$250,000,000 CJ est. value
Stockton, CA 95202

California Street Road Diet
Infrastructure
Bidding
$8,600,000 CJ est. value
Stockton, CA 95206

O'Reilly Auto Parts (ST6) / Stockton
New Construction, Infrastructure - 7,022 SF
Post-Bid
$1,800,000 CJ est. value
Stockton, CA 95209

Levee Rehabilitation Project
Infrastructure
Post-Bid
$370,000 est. value
Stockton, CA

Construction of Landfill Area 6 at The North County Recycling Center and Sanitary Landfill
Infrastructure
Results
$5,200,000 to $5,700,000 est. value
Lodi, CA 95240

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Accessible Path/Fencing for Future School Farm at Linden High School
Infrastructure
Construction
$127,304 CJ est. value
Linden, CA 95236

West Eighth Street Mixed Use Development.
New Construction, Infrastructure - 93,804 SF
Pending Verification
$22,500,000 CJ est. value
Stockton, CA 95206

CNG Fueling Station
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Tracy, CA 95376

Banner Island Ball Park Upgrade - EV23607 - City of Stockton
Renovation, Infrastructure
Conception
$2,811,000 est. value
Stockton, CA 95203

Beautification Clean California Project
Infrastructure
Design
$300,000 CJ est. value
Lodi, CA 95240

Last Updated 03/07/2023 01:24 PM
Project Title

Sanitary Sewer Maintenance Hole Rehabilitation

Physical Address View project details and contacts
City, State (County) Stockton, CA 95202   (San Joaquin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $276,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Sanitary Sewer Maintenance Hole Rehabilitation Clean Out Existing Maintenance Holes, Rehabilitate Walls With Mortar, and Line With an Epoxy Coating. Each Bid Shall Be Presented Under Sealed Cover and Shall Be Accompanied by the Bidder's Guaranty, Non-collusion Declaration, and All of the Required Documents and Information. Each Bidder Shall Be Licensed in Accordance With Applicable State Laws. the City of Stockton Encourages Local Stockton Firms to Bid This Project and the City Encourages Bidders to Use Local Stockton Firms as Subcontractors. Accordingly, the Local Business Preference Ordinance Applies to This Project. This Project is Subject to the Requirements of the City's Local Employment Ordinance. Please See the Website Noted Above for Further Information. Bidders Are Hereby Notified That the Successful Bidder and Any Subcontractor Under Them Shall Pay Prevailing Wage Rates in Accordance With the State of California Department of Industrial Relations. a Contract Will Be Awarded to the Lowest Responsible Bidder as Defined in the Stockton Municipal Code; Provided, However, That the City Council Reserves the Right to Reject Any and All Bids and to Re-advertise for Bids or to Provide for the Work to Be Done by the City of Stockton. The Successful Bidder Shall Be Required to Furnish a Labor and Material Bond and a Faithful Performance Bond, Each in the Sum of One Hundred Percent (100%) of the Contract Price. Said Bonds Shall Be Furnished by a Company Authorized to Issue Surety Bonds in the State of California. On Official Forms Furnished by City, Said Bonds Shall Be Executed by the Surety and Contractor Before or Concurrently With the Signing of the Contract. for Questions About This Project, Please Contact Amjad Masadeh at (209)937-7104, or Email Amjad.masadeh@stocktonca.gov.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents