Similar Projects
Forge Atlanta
New Construction
Design
$1,300,000,000 est. value
Atlanta, GA 30334

High Containment Continuity Laboratory - McCarthy Building Cos
New Construction, Infrastructure - 160,000 SF
Design
$233,000,000 CJ est. value
Atlanta, GA 30334

Lambert High School Addition
Addition, Demolition, Infrastructure - 5,800 SF
Bidding
$3,000,000 CJ est. value
Suwanee, GA 30024

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

IDIQ MATOC for Healthcare and Medical Research Laboratory Facility Design Build Construction, In Support of The Defense Health Agency (DHA) Sustainment, Restoration and Modernization Program
New Construction
Post-Bid

Cass High School Stem Lab
New Construction
Results
$109,900 est. value
White, GA 30184

Withlacoochee WPCP Lab And Shop Bldg Design And Construction
New Construction - 3,200 SF
Results
Valdosta, GA 31601

Atwood Chemistry Center 5th Floor Lab Renovation
Renovation - 2,822 SF
Construction
$448,000 est. value
Emory University, GA 30322

BPC Plasma
Renovation - 20,729 SF
Construction
$928,350 est. value
Statesboro, GA

Solvay N2004 Exhaust Fan Addition
Renovation
Post-Bid
Alpharetta, GA 30005

HCT Dental Lab Renovation
Renovation
Results
$640,000 to $645,000 est. value
Albany, GA 31701

Solvay AD Solutions Lab
Renovation - 2,040 SF
Construction
Alpharetta, GA 30005

Construction of High-Containment Continuity Laboratory (HCCL) - Building 28
New Construction
Post-Bid
$10,000,000 est. value
Atlanta, GA 30329

ASN Lab Renovations
Renovation
Results
$385,000 est. value
Albany, GA 31701

Golder Material Lab Relocation
Renovation - 10,047 SF
Construction
Norcross, GA 30093

Last Updated 09/19/2022 05:06 AM
Project Title

Space Renovation - Lab 125, 126, 130, and 229

Physical Address View project details and contacts
City, State (County) Byron, GA 31008   (Peach County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $426,045 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 15, 2022 Contract Award Number: 12405B22C0024 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: C3BKD1R9DKQ3 Contractor Awarded Name: MSAB LLC Contractor Awarded Address: Perry, GA 31069-9246 USA Base and All Options Value (Total Contract Value): $426045.84 The USDA, Agricultural Research Service (ARS) Southeast Area (SEA) Southeastern Fruit and Tree Nut Research Laboratory, located in Byron, GA., has a requirement (subject to the availability of funds) to Renovate Lab Space in Lab 125,126,130 and 229. The work includes but is not limited to: The contractor shall furnish all supervision, labor, materials, and equipment and perform all work necessary to remove existing casework, counter tops, electrical and plumbing fixtures and properly dispose of. The contractor shall install new casework, electrical, gas and plumbing fixtures. The contractor shall furnish all labor and materials for the described project in strict conformity with safety, standards, laws, statutes, and ordinances for a chemical/biological research laboratory biosafety level 2 (BSL2) in a federal facility. The work consists of and is not limited to providing all supervision, labor, materials, supplies, equipment, quality assurance and other related services and materials as required to: Removal of fume hoods in labs 125, 130 & 229. Fume Hoods are a Presumed Asbestos Containing Material (PACM). Removal must be done by a certified asbestos abatement tech and without disassembling. Once Fume Hood is removed, must be wrapped in two layers of 6 mil plastics and then disposed of as asbestos containing material (ACM). Demolition and removal of all casework. The contractor is responsible for locating and completely shutting off gas, water and electrical during this phase. All that can be recycled shall be recycled and weight recorded. Some demolition and removal of ceiling tiles and ceiling grid around fume hoods in labs 125, 130 and 229. The contractor shall provide and install all new lower cabinets, upper cabinets, sink cabinet, knee space assemblies, countertops, sinks, fixtures, electrical outlets and any fillers or scribes necessary for complete installation. This shall include final connections of any mechanical, gas, plumbing and electrical. All counter tops shall be 1" black phenolic resin worktop and Greengard certified - similar or exceed specifications of FunderMax RE-Technology (see attached brochure). A 6" high applied backsplash of same material as countertop. Will include sinks, outlets, pegboard, 30"w. x 30"h. w/46 Pegs & Drip Trough, cup sinks and some fabrication The contractor shall re-install undamaged ceiling grid and tiles or install new ceiling grid and tiles where applicable in rooms 125, 130 and 229. Water saver service fixtures and fittings to include H & CW faucets, H/C mixing faucet, DI faucet, pre- rinse hose unit, and deck mounted AGV service valves and required mounting hardware. All valves will be mounted in original locations unless specified otherwise. Wall mounted single channel electrical raceway, wiring, outlets and cover plates. Must be installed in accordance with the most recent National Electrical Code (NEC). If an equivalent metal wire mold is going to be used, its use must first be pre-approved.. Cove Base moldings shall be removed from walls and new installed on walls and base cabinets. Moldings shall be black Please refer to Section L.7 (b) of the attached Clauses and Provisions for site visit information. SIZE OF PROJECT: In accordance with FAR 36-204, the estimated price range is between $100,00 and $250,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents