Project Title | Space Renovation - Lab 125, 126, 130, and 229 |
Physical Address | View project details and contacts |
City, State (County) | Byron, GA 31008 (Peach County) |
Category(s) | Laboratory |
Sub-Category(s) | Laboratory |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $426,045 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Sep 15, 2022 Contract Award Number: 12405B22C0024 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: C3BKD1R9DKQ3 Contractor Awarded Name: MSAB LLC Contractor Awarded Address: Perry, GA 31069-9246 USA Base and All Options Value (Total Contract Value): $426045.84 The USDA, Agricultural Research Service (ARS) Southeast Area (SEA) Southeastern Fruit and Tree Nut Research Laboratory, located in Byron, GA., has a requirement (subject to the availability of funds) to Renovate Lab Space in Lab 125,126,130 and 229. The work includes but is not limited to: The contractor shall furnish all supervision, labor, materials, and equipment and perform all work necessary to remove existing casework, counter tops, electrical and plumbing fixtures and properly dispose of. The contractor shall install new casework, electrical, gas and plumbing fixtures. The contractor shall furnish all labor and materials for the described project in strict conformity with safety, standards, laws, statutes, and ordinances for a chemical/biological research laboratory biosafety level 2 (BSL2) in a federal facility. The work consists of and is not limited to providing all supervision, labor, materials, supplies, equipment, quality assurance and other related services and materials as required to: Removal of fume hoods in labs 125, 130 & 229. Fume Hoods are a Presumed Asbestos Containing Material (PACM). Removal must be done by a certified asbestos abatement tech and without disassembling. Once Fume Hood is removed, must be wrapped in two layers of 6 mil plastics and then disposed of as asbestos containing material (ACM). Demolition and removal of all casework. The contractor is responsible for locating and completely shutting off gas, water and electrical during this phase. All that can be recycled shall be recycled and weight recorded. Some demolition and removal of ceiling tiles and ceiling grid around fume hoods in labs 125, 130 and 229. The contractor shall provide and install all new lower cabinets, upper cabinets, sink cabinet, knee space assemblies, countertops, sinks, fixtures, electrical outlets and any fillers or scribes necessary for complete installation. This shall include final connections of any mechanical, gas, plumbing and electrical. All counter tops shall be 1" black phenolic resin worktop and Greengard certified - similar or exceed specifications of FunderMax RE-Technology (see attached brochure). A 6" high applied backsplash of same material as countertop. Will include sinks, outlets, pegboard, 30"w. x 30"h. w/46 Pegs & Drip Trough, cup sinks and some fabrication The contractor shall re-install undamaged ceiling grid and tiles or install new ceiling grid and tiles where applicable in rooms 125, 130 and 229. Water saver service fixtures and fittings to include H & CW faucets, H/C mixing faucet, DI faucet, pre- rinse hose unit, and deck mounted AGV service valves and required mounting hardware. All valves will be mounted in original locations unless specified otherwise. Wall mounted single channel electrical raceway, wiring, outlets and cover plates. Must be installed in accordance with the most recent National Electrical Code (NEC). If an equivalent metal wire mold is going to be used, its use must first be pre-approved.. Cove Base moldings shall be removed from walls and new installed on walls and base cabinets. Moldings shall be black Please refer to Section L.7 (b) of the attached Clauses and Provisions for site visit information. SIZE OF PROJECT: In accordance with FAR 36-204, the estimated price range is between $100,00 and $250,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |