Similar Projects
O'Reilly Auto Parts (HRO) / Hernando
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Hernando, MS 38632

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Chester Willis Field Renovation
Infrastructure, Renovation
Design
$2,500,000 CJ est. value
Natchez, MS 39120

ARPA Improvements - Wells and Solar in County
Infrastructure
Bidding
$3,702,287 CJ est. value
Hazlehurst, MS 39083

Construction of 0.742 Miles of Overlay on the Friars Point Road
Infrastructure
Bidding
$359,000 CJ est. value
Clarksdale, MS 38614

Hermanville Multi-Use Trail
Infrastructure
Post-Bid
$200,000 CJ est. value
Port Gibson, MS 39150

Choctaw County Schools Football Stadium
New Construction, Infrastructure
Post-Bid
$70,000 CJ est. value
Ackerman, MS 39735

Abraham House of God
New Construction, Infrastructure
Results
$2,800,000 CJ est. value
Horn Lake, MS 38637

Woodland Clinic Addition
Addition, Demolition, Renovation, Infrastructure
Results
$418,500 CJ est. value
Woodland, MS 39776

McAlister's Deli / Greenwood
Demolition, New Construction, Infrastructure - 3,000 SF
Construction
$1,300,000 CJ est. value
Greenwood, MS 38930

Hernando High School
New Construction, Infrastructure
Construction
$85,211,000 CJ est. value
Hernando, MS 38632

Velocys Bayou Fuels Project - Belwood Industrial Park
New Construction, Infrastructure
Pending Verification
$1,500,000,000 CJ est. value
Natchez, MS 39120

38th Avenue Pathway
Infrastructure
Pending Verification
$350,000 CJ est. value
Hattiesburg, MS 39401

Sage Creek Phase 1 Residential
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Horn Lake, MS 38637

Street Cut (Utility Trench) Patching, Lay Down of Hot Mix Asphalt, Hot Mix Asphalt, Street Striping, Ready Mix Concrete, and Flowable Fill
Infrastructure
Bidding
$2,000,000 CJ est. value
Natchez, MS 39120

Last Updated 09/06/2023 11:29 AM
Project Title

Ackerman Elementary Addition

Physical Address View project details and contacts
City, State (County) Ackerman, MS 39735   (Choctaw County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Your firm is invited to submit an offer under seal to Owner for construction of a corridor addition located at: 8475 MS-15, Ackerman, MS 39735. Project Description: This project consists of corridor addition as described in the Construction Documents and Specifications. Bidders will be required to provide Bid security in the form of a sum no less than 5 percent of the Bid Amount or a certified check for a sum no less than 5 percent of the Bid Amount. Refer to other bidding requirements described in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information Submit your offer on the Bid Form provided. Bidders may supplement this form as appropriate. If Bids are mailed or hand delivered, then they must be contained in a sealed envelope marked on the outside with the project name. They must be on file as received or delivered by the time stated above to the address of the Owner stated above. Do not deliver Bids to the project address or the Architect's address. Bids in excess of $50,000.00 must be marked on the outside of the envelope with the contractor's Mississippi certificate of responsibility number as issued by the Mississippi Board of Contractors along with a copy of the General Contractor's proof of Mississippi license. Your offer will be required to be submitted under a condition of irrevocability for a period of 60 days after submission. The Owner reserves the right to accept or reject any or all offers. Bid Bond of a sum no less than 5 percent of the Bid Amount Complete the Work in 180 calendar days from Notice to Proceed Direct questions to David Machado or Vanessa Hemenway, at email: dmachado@mpdesigngroup.us and vanessa@mpdesigngroup.us respectively

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents