Student Center HVAC Upgrades
Alteration
Post-Bid
Grand Rapids, MI

Grandville Public Schools - High School Ionization
Alteration
Post-Bid
Wyoming, MI 49418

HVAC Maintenance and Repair Services - Fire, Mobile GR, Facilities Management
Term Contract
Results
Grand Rapids, MI

Wyoming Senior Center HVAC Replacement
Alteration
Results
Wyoming, MI 49509

Classroom A/C Project
Alteration
Post-Bid
Wyoming, MI

Cooling Tower Replacement
Alteration
Results
Grand Rapids, MI

Duct Cleaning Services, Hvac System
Alteration
Post-Bid
Grand Rapids, MI

High School Chiller and Dehumidification Upgrades
Alteration
Results
$575,000 est. value
Grand Rapids, MI 49503

HVAC Services, Heat Pump Replacements - Grand Rapids Police Department
Term Contract, Alteration
Post-Bid
Grand Rapids, MI 49503

2023 HVAC Improvements Kent Hills and Wellerwood
Renovation
Results
$3,625,000 CJ est. value
Grand Rapids, MI 49503

Hvac Upgrades - Congress Elementary, Aberdeen Elementary & Stocking Elementary Schools
Renovation
Post-Bid
$2,500,000 CJ est. value
Grand Rapids, MI 49503

Roof Top Unit HVAC Installation - Justice Center
Renovation
Results
$52,376 CJ est. value
Kentwood, MI 49512

Treatment Services, Chemical, Boiler/Water Systems
Term Contract
Post-Bid
Grand Rapids, MI 49503

GRPS HVAC Improvements - 2023 Projects
Renovation
Post-Bid
$300,000 CJ est. value
Grand Rapids, MI 49506

Kent County Waste to Energy MCC and USS Room HVAC Project
Renovation
Post-Bid
$90,000 CJ est. value
Grand Rapids, MI 49503

Last Updated 05/08/2023 06:02 PM
Project Title

Boiler Replacement Kraft Meadows Intermediate School

Physical Address View project details and contacts
City, State (County) Caledonia, MI 49316   (Kent County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Please consider this document as formal Request for Bid (RFB) for the replacement of HVAC boilers at Kraft Meadows Intermediate School at Caledonia Community Schools. All bidders shall direct any questions and inquiries to Matthew Hess, Executive Director of Operations and Transportation, 616.891.0225. Scope of Work 1) The District is seeking the removal and replacement of the HVAC boiler system at Kraft Meadows Middle School 9230 Kraft Ave SE, Caledonia MI 49316. 2) Inclusive of all engineering, design, state submission, disposal, acquisition, installation, and repairs/patching of the facility to provide a fully tested, approved, and functioning system prior to October 1, 2023. a) Contracting or subcontracting as needed for any area, including electrical, should be included or specifically noted as not included. b) Controls and control work for connection and programming will be supplied by the owner and are to be scheduled for installation with the boilers and system. 3) All equipment, parts, and supplies must include (at a minimum) the standard manufacturer's warranty (in writing) beginning at the system turnover-to-owner date. 4) Any alternates proposed to this may be submitted on separate sheets. 5) All potential rebates submissions are to be completed by the installer - the beneficiary of rebates will be Caledonia Community Schools. 6) All work to be completed in a professional manner, in accordance with laws regarding presence on school grounds, cleanup and cleaning of the work area are to be accomplished daily. 7) Work to be completed includes (but not limited to): a) Removal of 3 Bryan Boilers i) 4,500,000 BTU's / 80% efficient each ii) Removal of the 36" combustion vent through the roof and combustion air intake b) Removal of the unit heater i) Removal of the combustion vent through the room. c) Installation of two new high efficiency boilers. District preferences: (1) Aerco (2) Lochinvar d) Installation of pipe openings for any future boiler mate water heaters e) Required re-piping i) New boiler loop in the room ii) New dirt and air separator iii) New expansion tanks (Remove three existing expansion tanks. iv) Install three new ground mounted bladder style expansion tanks (1) 300 gallon for the Chilled (Glycol), (2) 400 gallon for the AHU's (Glycol), (3) 400 gallon for the Boilers (Water) f) Two new ECM system pumps g) Pipe insulation and repair as needed h) Gas piping as required i) Install a new exhaust fan and intake louver on the roof for room ventilation j) Patching and sealing of walls and roof 8) Testing, Balancing, and Commissioning of the installation and system. Award It is the intention of the district to award a contract at the regular Board of Education meeting May 15, 2023. Caledonia Community Schools reserves the right to make awards within sixty (60) days after the date of the bid opening during which period bids may not be withdrawn unless the bidder distinctly states in the bid that acceptance thereof must be made within a shorter specified time

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents