Similar Projects
Last Updated | 06/26/2020 12:47 PM |
Project Title | I-19-4496 - Roadway & Bridge Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | IL (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $48,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Tri-State Tollway (I-294) Ramp J from South of I-88 to North of I-290 M.P. 31.5 to M.P. 34.9, in Dupage County and Cook County. The work under this contract shall consist of: Roadway and Bridge Reconstruction Tri-State Tollway (I-294) Ramp J from South of I-88 to North of I-290 M.P. 30.9 to M.P. 31.8, including: The reconstruction of portions of I-294 Ramp J, bridge rehabilitation of bridge number 209CD (Ramp J over I-88 and Ramp D), bridge reconstruction of bridge number 211CD (Ramp J over Butterfield Road) and 219CD (Ramp J over CC&P RR), and bridge construction of bridge number 221CD (Ramp J over I-290). Work also includes retaining wall repairs and construction, noise abatement wall construction, noise abatement wall removal, mechanically stabilized earth retaining wall removal, concrete retaining wall removal, utility protection for 90 inch watermain, drainage and utility improvements, intelligent transportation system (ITS) infrastructure, temporary and permanent lighting systems, erosion control measures and landscaping improvements, signing, and maintenance of traffic operations. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |