Similar Projects
Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Southern Boulevard Town Center
New Construction - 400,000 SF
Conception
$10,000,000 CJ est. value
Royal Palm Beach, FL 33414

Harvest Tabernacle Church - Recreation Center
Addition - 13,004 SF
Design
$1,500,000 est. value
Sarasota, FL 34235

Chabad of Hollywood
Addition - 5,187 SF
Design
$400,000 est. value
Hollywood, FL 33019

The Learning Experience and Office Building Shell
New Construction - 20,000 SF
Bidding
Viera, FL

Palm Coast United Methodist Church
New Construction - 25,495 SF
Post-Bid
$7,000,000 est. value
Palm Coast, FL 32137

Addition/Alteration and Repair Child Development Center, Bldg 90353
Addition - 1,789 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Hurlburt Field, FL 32544

Pineywood Cemetery Columbarium
Results
Winter Park, FL 32792

First Baptist Church at Hillsboro
New Construction - 25,000 SF
Construction
$2,945,000 est. value
Coconut Creek, FL 33073

Islamic Center of Daytona Beach - Phase 1
New Construction, Renovation, Addition - 36,934 SF
Construction
$2,000,000 est. value
Daytona Beach, FL 32117

Chapel Of Faith
New Construction - 5,944 SF
Pending Verification
Tampa, FL 33604

Hastings - Mixed-Use
New Construction - 20,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Sorrento, FL

Learning Together Academy
New Construction, Renovation - 8,792 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Margate, FL 33063

Kingdom Hall
New Construction - 3,793 SF
Design
$500,000 est. value
Lehigh Acres, FL 33971

The Learning Experience
New Construction - 16,323 SF
Post-Bid
$1,425,000 est. value
Palm Beach Gardens, FL 33403

Reported 11/08/2021 10:51 AM
Project Title

Chabad Center of Kendall & Pinecrest

Physical Address View project details and contacts
City, State (County) Miami, FL 33176   (Miami-Dade County)
Category(s) Education, Religious/Funeral
Sub-Category(s) Pre-School/Daycare, Religious Facility
Contracting Method
Project Status Construction Commenced October 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Pre-School/Daycare, New Construction, Religious Facility, 20,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents