Similar Projects
Aircraft Hangars at Smith Reynolds Airport
New Construction - 20,000 SF
Sub-Bidding
Winston-Salem, NC 27105

Design-Build for Smith Reynolds Airport Quonset Hangar Renovations
Renovation
Post-Bid
Winston-Salem, NC 27105

P197 DB Aircraft Maintenance Hangar, MCAS Cherry Point, NC
New Construction
Post-Bid
$181,430,000 est. value
Cherry Point, NC

T-Hangar and Taxilane Design
Results
North Wilkesboro, NC 28659

Design-Build for Smith Reynolds Airport New Corporate Hangar Project
Renovation
Results
Winston-Salem, NC 27105

Schedule 1 - New Corporate Hangar and Schedule 2 - Site Work and Utility Improvements
Construction
Roxboro, NC 27573

EWN Corporate Box Hangars
New Construction
Construction
$5,000 to $9,999 est. value
New Bern, NC 28562

Blue Line Aviation
New Construction
Pending Verification
Smithfield, NC

145th AW Add/Alter Small Air Terminal
Addition - 15,700 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Charlotte, NC

Shelby T-Hangar and Taxilane Phase 2
Renovation
Results
Shelby, NC

Johnson Regional Airport Hangar and Office Space
New Construction
Post-Bid
Smithfield, NC

Corporate Hangars 27, 28, 29, 30 And 31
New Construction - 59,200 SF
Results
$5,000,000 to $10,000,000 CJ est. value
Greenville, NC

Hangar Replacement and Access Road/Parking Improvements
Renovation, Infrastructure
Post-Bid
Stoneville, NC

T-Hangar Area Development Fayetteville Regional Airport
Renovation
Results
Fayetteville, NC

T-Hangar and Hangar Taxilanes Site Preparation and Paving
New Construction, Infrastructure
Post-Bid
Burlington, NC

Last Updated 01/20/2022 04:31 PM
Project Title

Hickory Airport Hangar

Physical Address View project details and contacts
City, State (County) Hickory, NC   (Catawba County)
Category(s) Transportation
Sub-Category(s) Aircraft Hangar
Contracting Method
Project Status Construction Commenced December 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials and equipment entering into the construction of a New Hangar for the City of Hickory, Hickory Airport, N.C. all Site, General, Plumbing, Mechanical and Electrical Work.

Details

Aircraft Hangar, Renovation.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents