Similar Projects
Last Updated | 09/22/2021 07:42 AM |
Project Title | Parma #2 Boiler Replacement Boiler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Cleveland, OH (Cuyahoga County) |
Category(s) | Single Trades |
Sub-Category(s) | Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Metro Health is seeking to replace a steam generating boiler. Remove and Replace existing Boiler -Turnkey One (1) Cleaver-Brooks Model M5-200-4000-150ST Packaged Water tube High Pressure Boilers each as follows: Capacity: 4000 MBH Input; 3200 MBH Output Boiler Horsepower: 96 BHP Heating Surface: < 358 Sq. Ft to meet State of Ohio unattended boiler operation Design Pressure: 150 PSIG Fuel Series: Natural Gas & #2 Oil (spark ignited gas) Burner: Integral Emissions: N/A Firing Rate: Full Modulation @ 3:1 Turndown on Natural Gas (2:1 on #2 Oil) Combustion Control: CB780E burner control with annunciation, self-checking logic and U.V. flame safeguard. Blower Motor: 5 HP; ODP; 460/3/60 Oil Pump Motor: Driven off blower motor |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |