Similar Projects
Heber Avenue Improvements
Infrastructure
Results
$953,375 est. value
Heber, CA 92249

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Dogwood Avenue Improvement Project
Infrastructure
Results
$900,000 est. value
El Centro, CA

Oak Lateral Concrete Lining from Delivery 5 to Delivery 6
Infrastructure
Results
Brawley, CA 92227

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Asphalt Rubber Binder Chip Seal, Pavement Markings and Shoulder Backing
Infrastructure
Results
$3,400,000 est. value
CA

Cold in -Place Recycling, RHMA-G Overlay, Pavement Markings
Infrastructure
Results
$3,880,000 est. value
CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Cold Plane, SAMI, RHMA-G and Pavement Markings
Infrastructure
Results
$1,700,000 est. value
CA

N55 Paving and Drainage Improvements Phase I
Infrastructure
Results
$3,000,000 est. value
Imperial, CA 92251

Asphalt Seal Coat and Restripe at Various Sites
Infrastructure
Post-Bid
$60,000 est. value
Imperial, CA

Orchard Road Improvements From State Route 7 to Alamo River
Infrastructure
Bidding
$1,818,931 est. value
Holtville, CA 92250

Street Maintenance Improvement Project - FY 2021/2022
Infrastructure
Results
Calipatria, CA 92233

Bombay Beach Townsite Roadway Improvement Project
Infrastructure
Post-Bid
$2,568,974 est. value
Imperial, CA

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Reported 07/06/2022 09:27 AM
Project Title

Roadside Safety Improvements

Physical Address View project details and contacts
City, State (County) Holtville, CA   (Imperial County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $3,831,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Holtville, California. Design plans call for site work for a road / highway; and for paving for a road / highway. Roadside Safety Improvements Project ID : 1112000158 Bkpm: 32.4 Ahpm : 46.1 Proposed Advertise Date : 21/11/2022 As of July 05, 2022, the project is in Design status. Anticipated construction year is 2023. CADOT - Roadside Safety Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents