Similar Projects
Remove, Furnish and Install a New Air Compressor at Fire Station 1
Alteration
Bidding
$95,000 est. value
Dracut, MA 01826

Replace HVAQC System Brigade HQ Building 102 - GC Bid
Alteration
Bidding
$1,000,000 est. value
MA

Replace HVAQC System Brigade HQ Building 102 - SUB Bid
Alteration
Sub-Bidding
$1,000,000 est. value
MA

Watertown Middle School - Second Floor HVAC Upgrade
Alteration
Sub-Bidding
$1,400,000 est. value
Watertown, MA 02472

Maintenance and Repair of HVAC for Various Schools
Post-Bid
Everett, MA

Station 4 Air Conditioning Project
Post-Bid
Less than $125,000 est. value
Reading, MA 01867

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Watertown Middle School - Second Floor HVAC Upgrade - General Bid
Alteration
Bidding
$1,400,000 est. value
Watertown, MA 02472

Purchase and Install HVAC Ionization and UV System Upgrades at Library Facilities
Post-Bid
Concord, MA

Watertown Police Department Firing Range HVAC Upgrades - General Bids
Results
Less than $450,000 est. value
Watertown, MA

HVAC Air System Rebalancing
Post-Bid
$150,000 est. value
Chelmsford, MA

Watertown Police Department Firing Range HVAC Upgrades - Filed Sub Bids
Results
$425,000 est. value
Watertown, MA 02472

Barbieri Warehouse Rooftop Unit
Post-Bid
$300,000 est. value
Framingham, MA

Mercier Center HVAC Renovation
Results
Less than $58,500 est. value
Lowell, MA 01854

Last Updated 05/03/2022 06:45 AM
Project Title

Durgin 213 Recording Studio Air Conditioner Replacement

Physical Address View project details and contacts
City, State (County) Lowell, MA   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $145,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Durgin 213 Recording Studio Air Conditioner Replacement. The Durgin 213 project shall replace the aging package AC unit for the recording studio with a similar but higher capacity unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents