Similar Projects
HVAC Filtration Systems Upgrades
Post-Bid
Austell, GA 30106

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace (5) Five HVAC Units with Energy
Results
Atlanta, GA 30312

HVAC Service to Include Repair & Maintenance
Results
Powder Springs, GA

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

GC Services Briar Vista Elementary School Gymnasium HVAC Installation
Results
Less than $134,500 est. value
Atlanta, GA 31324

Sodium Hypochlorite and Fluoride Pump Rooms Ventilation
Alteration
Post-Bid
Marietta, GA 30067

Sparks Hall Phase 2, 4th and 3rd Floor HVAC Upgrades
Results
Less than $1,800,000 est. value
Atlanta, GA 30303

Food and Nutrition Services Summer 2022 Freezer/Cooler Replacement and Renovations
Alteration
Post-Bid
Kennesaw, Mableton, Marietta, GA 30152

Needlepoint Bipolar Ionization Units
Results
Marietta, GA 30060

Addison Elementary School HVAC Modifications 2021
Results
Less than $2,100,000 est. value
Marietta, GA 30066

Hayes ES Mount Bethel ES Lost Mountain MS Cooler Freezer HVAC Replacement
Results
Kennesaw, GA 30152

Chiller and Cooling Tower Maintenance Service
Term Contract
Results
Marietta, GA 30060

30 Ton Rooftop Unit Timber Ridge ES
Results
Marietta, GA 30068

Boilers Replacement Building C And D
Results
$100,000 to $130,000 est. value
Marietta, GA 30060

Last Updated 12/10/2021 03:59 PM
Project Title

HVAC Modifications for New Elections Headquarters

Physical Address View project details and contacts
City, State (County) Marietta, GA 30060   (Cobb County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work shall include but not be limited to the following: Provide engineering data and calculations supporting requirements necessary to condition the building for facility use. Perform test and balance before completion date and three (3) months after completion of project. All of the existing sheet metal referred to remain on pages M101a and M101B has been removed and will need to be replaced with new ducting and insulation. All penetrations and sealing of penetrations to the building will be the responsibility of the Contractor. All penetrations and sealing methods will be approved by the Owner before action is taken. Project Foreman shall be on site during construction. Project Manager shall attend all meetings. Controls shall be Siemens.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents