Similar Projects
Franklin Muskego Force Main Improvements
Infrastructure
Bidding
Milwaukee, WI

Dretzka Parking Lot and Gravity Sanitary Sewer Extension
Infrastructure
Bidding
Milwaukee, WI 53224

On-Call Construction Services for Sewer Repair and Rehabilitation
Term Contract
Post-Bid
Milwaukee, WI

Combined Sewer Overflow (CSO) 195 Relocation
Renovation
Post-Bid
Milwaukee, WI

Sanitary and Storm Relays
Results
West Allis, WI 53214

2020 Brown Deer Mainline Sanitary Sewer CIPP Lining
Results
Less than $662,000 est. value
Milwaukee, WI 53223

New Sanitary Sewer And Sanitary Sewer Relay
Infrastructure
Bidding
Milwaukee, WI 53274

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

Sanitary Sewer Main Relay
Renovation
Results
$359,000 est. value
Milwaukee, WI

2022 Roadway Program
Infrastructure
Bidding
$1,600,000 est. value
Hales Corners, WI

Sewer Construction
Post-Bid
Milwaukee, WI

Sanitary Sewer Connection Liners
Results
Less than $174,625 est. value
West Allis, WI 53214

65th and 66th Street
Infrastructure
Bidding
$1,376,100 est. value
West Allis, WI 53214

Combined Sewer Main Relay & Combined Sewer Lining and Manhole Repair & Lining
Post-Bid
Milwaukee, WI

Access Hatch Replacement Phase 6
Results
Milwaukee, WI

Last Updated 02/09/2022 04:48 PM
Project Title

Pipeline Cleaning Phase 2 - Interplant Sludge System Improvements

Physical Address View project details and contacts
City, State (County) Milwaukee, Oak Creek, Saint Francis, WI   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project contemplated consists of: • Providing cleaning of four ductile iron pipelines to remove accumulated sludge solids • One pipeline at a time will be taken out of service, isolated and provided for cleaning • Providing removal of drain piping and providing new drain valves • Providing draining of pipelines at five low point vaults, including removal, transportation and disposal of the drained water and solids • Providing inspection of piping for accumulation of solids at five low point vaults and seven high point vaults • Providing hydro-cleaning of each Pipeline at selected vaults as directed by the Engineer • Providing removal, transportation and disposal of the hydro-cleaning water and solids • Providing televising of pipeline segments as directed by the Engineer • Providing removal and replacement of piping • Providing new pipeline isolation valves and pipe couplings • Providing venting of the pipeline at seven high point vaults • Providing Pipeline Insertion Gage (PIG) cleaning of each pipeline from selected vaults and from the Water Reclamation Facilities • Providing pipe bonding in each vault • Providing abatement of existing lead based paint coatings • Providing surface preparation and painting of the pipes and valves • Providing cleaning of the Vaults • All other work shown in the Specifications and on the Plans

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents