Similar Projects
Relief Wells at Wood River Levee District - USACE St. Louis
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Wood River, IL 62095

Well 3 and Well 4 Filter and Softener Media Replacement
Infrastructure
Bidding
Saint Charles, IL 60174

Well 3 and Well 4 Filter and Softener Media Replacement
Infrastructure
Bidding
Saint Charles, IL 60174

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Wyckles East Lagoon Decant Structure Upgrades
Infrastructure
Bidding
Decatur, IL 62522

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Improvements to City Well Number 31
Results
Naperville, IL 60540

Logan, Water Tower Pump
Infrastructure
Bidding
Lincoln, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

2021 Water Facilities Waste Pump Inspection and Repair
Post-Bid
Carpentersville, IL 60110

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

Reported 09/21/2021 12:00 AM
Project Title

Well #5 Inspection and Repair

Physical Address View project details and contacts
City, State (County) Maple Park, IL   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Maple Park currently has two (2) municipal wells, which provide the Village with its potable water supply. It is the intention of the Village to have Well #5 pulled for inspection and rehabilitated in accordance with the Village of Maple Park’s Capital Improvement Plan/Maintenance Plan (CIP/MP.) Each well is now on a five-year inspection cycle.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents