Similar Projects
St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

Walworth - Elkhorn, Geneva Street to Glenwood Drive; Walworth - Elkhorn, Geneva Street to Glenwood Drive
Infrastructure
Bidding
$2,000,000 CJ est. value
Elkhorn, WI 53121

Richmond - Whitewater, CTH A to Willis Ray Road
Infrastructure
Bidding
$4,000,000 CJ est. value
Whitewater, WI 53190

2022 Street Program and Fontana Boulevard Irrigation System
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Fontana, WI 53125

2022 Sewer Rehabilitation
Infrastructure
Post-Bid
$550,000 CJ est. value
Elkhorn, WI 53121

Athletic Field Grading and Drainage
Renovation, Infrastructure
Results
$533,700 est. value
Delavan, WI 53115

Construction of the Main Street to Second Street Alley Utility and Pavement Improvements
Infrastructure
Results
$229,265 CJ est. value
Delavan, WI 53115

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Schwager Drive Reconstruction
Infrastructure
Pending Verification
$1,538,400 CJ est. value
Whitewater, WI 53190

IH 43 Rock Freeway - Wisconsin Department of Transportation
Infrastructure
Pending Verification
$30,000,000 CJ est. value
Elkhorn, WI 53121

2023-01 Joint and Crack Cleaning and Sealing
Infrastructure
Bidding
$800,000 CJ est. value
Lake Geneva, WI 53147

Sharon Nelson Street Sanitary Sewer and Street Replacement
Infrastructure
Post-Bid
$649,381 CJ est. value
Sharon, WI 53585

Wood Street Project
Infrastructure
Results
$67,689 CJ est. value
Walworth, WI 53184

Dollar General / Whitewater
New Construction, Infrastructure - 10,640 SF
Pending Verification
$2,800,000 CJ est. value
Whitewater, WI 53190

2023 Street Improvement Project - Phase 3 - Wrigley Drive ADA Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Lake Geneva, WI 53147

Last Updated 12/08/2022 02:31 PM
Project Title

Theatre Rd. Tennis and Basketball Courts

Physical Address View project details and contacts
City, State (County) Williams Bay, WI 53191   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $219,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All bidders of materials, services, and equipment will be required to post Performance Security as described in the Invitation to Bidders. The Village of Williams Bay reserves the right to reject any or all bids, parts of any or all bids, or to waive technical errors or omissions in bids. Purchase and Construction of Tennis and Basketball Courts at The Village-Owned Park Off Theatre Road Questions concerning this Invitation to Bid shall be submitted, in writing, to Becky Tobin, Village Administrator. Questions shall be received by 12:00 noon (local time), November 22, 2022. Questions shall be emailed to admin@williamsbay.org. If necessary, answers to questions will be provided to all specification holders in the form of an addendum. Construction shall be in the spring of 2023 and be completed no later than May 31, 2023. Contractor shall coordinate the start date with the Village Administrator. This project consists of constructing two (2) tennis courts and two (2) half basketball courts. The total area is approximately 18,200 S.F. Project will include fencing, net posts, goal posts, nets, hoops, lighting, and landscaping. 1. Project Management: This work includes responsible daily onsite management of the project, drawings for local building permits, plan printing, dust protection, site protection, signage, general job site cleanup, and project insurance. Complete administrative management throughout the project and complete documentation expected at completion of the project. 2. Excavate grass and dirt to establish sub-grade. Export to the Village fill site, nearby. There is to be a 1% cross slope for tennis courts and flat at the basketball area. Compact sub-grade. 3. Install 8" crushed stone base. Laser-grade for 1% slope east and flat west; 0% slope north/south tennis courts. Fine grade and compact. 4. Hot asphalt pave 3 1/2" average compacted thickness in 2 layers, on separate days. Stagger paving joints. Includes 12.5 mm binder, 2" thick and LT-9.5 mm surface, 1 1/2" thick. 5. Install 4 coat acrylic color surface for 2 tennis courts. Includes 2 coats of black textured acrylic resurfacer and 2 coats of Pro-Blue play areas, Medium Green foul areas. All coats to be cross applied. All material is 100% acrylic base. 6. Layout and install white masked tennis lines, blended yellow pickleball lines, two (2) sharing the same net. 7. Layout and install two (2) half-court basketball lines on unsealed asphalt with airless sprayed white lines. 8. Two (2) steel 10 feet tall basketball baskets, fan-shaped, rust-free backboard has support braces for stability. Steel double-rim goal with no-fail net lock system has a steel backplate. Pole provides 48-inch safe-play area and is buried 48 inches into the ground. 9. Install two (2) regulation tennis court nets. High performance 42ft tennis nets (regulation doubles). Materials should include heavy duty 3.5 mm braided HDPE net twine & features and quad-stitched optic white headband. An 8kg net conforms to ITF Tournament Regulations. 10. Install 464' of 10' high galvanized chain link fence, with 1 5/8" top rail. Chain link fabric galvanized 9-gauge wire, 2' mesh. Line posts 2" OD, 2240 galvanized steel pipe, spaced 10' on center, driven 4'. 2-3" OD. 2240 galvanized steel pipe, end posts, driven 5'. Fence is only around the tennis courts. Fence should include a gate on the south end of the tennis courts. 11. Landscaping around the perimeters shall include applying topsoil if needed, leveling off the dirt, and planting grass seed. 12. Install electricity from the concession building to the new courts. 13. Install a minimum of six (6) light fixtures for the tennis courts and minimum of four (4) light fixtures for the basketball court. All lighting should be LED Sports lights mounted to a pole. Lighting system shall include push button court lighting controls and glare shield visor to limit light pollution.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents