Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Bidding
Less than $20,000,000 est. value

Electrical Maintenance and Repair
Alteration
Bidding

NATO HQ SACT Solar Power System Installation and LED Lighting Conversion for Headquarters Supreme Allied Command Transformation
Post-Bid
Norfolk, VA 23551

Electrostatic Disinfection Services
Term Contract
Post-Bid
Less than $71,000 est. value
Norfolk, VA 23504

Generator Replacement for Harrison Opera House
Results
Norfolk, VA

Moores Bridges Water Treatment Plant Transformers and Cable Replacement
Results
Norfolk, VA 23502

Diesel Generator Rental
Term Contract
Bidding
Norfolk, VA 23511

Replace Electrical Switchgear, Pier 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Norfolk, VA

Electrical and Lighting Repair/Replacement IDQ FY21
Term Contract
Results
Norfolk, VA 23510

Replace Secondary Switchgear, Pier 8
Post-Bid
$500,000 to $1,000,000 est. value
Norfolk, VA

Radio Station Stereo Generator
Results
$14,072 est. value
Norfolk, VA 23504

Repair or Replacement of Generator Circuit Breaker
Post-Bid
Norfolk, VA 23511

Electrical Maintenance and Repair
Term Contract
Results

UPS and Power Strip
Alteration
Post-Bid
Norfolk, VA

Last Updated 12/02/2021 11:29 AM
Project Title

Wilson Hall Electrical Upgrades and Screen Wall

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23504   (Norfolk City County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as an installation of new electrical switch gear to provide future distribution capacity with support from a stand by backup gas generator (The existing 1600 amp electric service to the building will remain) which will be located inside an exterior screen enclosure. There will be associated interior and exterior work involving the disciplines of civil, structural, architectural, mechanical, plumbing, and electrical work.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Hazardous Material Assessment, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Metal Fabrications.
Division 07 - Thermal and Moisture Protection, Firestopping, Penetration Firestopping, Joint Sealants.
Division 08 - Openings, Metal Frames, Hollow Metal Frames, Door Hardware.
Division 09 - Finishes, Gypsum Board, Acoustical Ceilings, Painting and Coating.
Division 22 - Plumbing, Plumbing Piping.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Access Control.
Division 31 - Earthwork, Earth Moving.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents