Similar Projects
Existing Township Hall Remodel
Renovation
Conception
Saugatuck, MI

Renovation - City Clerk Department - FAC036 - City of Novi
Renovation
Conception
$250,000 est. value
Novi, MI

14-B District Court & Ypsilanti Township Civic Center
Renovation
Design
Ypsilanti, MI 48197

Dansville District Re-key
Renovation
Design
$50,000 CJ est. value
Dansville, MI 48819

Macomb County 2022 Paving Projects 16th Circuit Court/Old County Building
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Clinton Township, MI 48036

SANGB(Selfridge Air National Guard Base (SANGB)) Door Replacement Project Building 139
Alteration
Bidding
$500,000 est. value
Harrison Township, MI 48045

Window Replacement Woodbine Lodge
Renovation
Sub-Bidding
$20,000 CJ est. value
Saint Joseph, MI 49085

Door Safety Barricades
Renovation
Sub-Bidding
$320,000 CJ est. value
Port Hope, MI 48468

Door Removal/Replacement Project
Post-Bid
Clinton Township, MI 48035

Wood Window Replicas
Post-Bid
Detroit, MI

Structural Repairs / Replacements - St Louis Correctional Facility
Results
Saint Louis, MI 48880

Ingham County Justice Complex- BP 5 General Trades
Results
Mason, MI 48854

Ottawa County Family Justice Center
Renovation
Construction
$200,000 CJ est. value
West Olive, MI 49460

Overhead Doors for Maintenance and Bus Storage Facilities
Alteration
Bidding
$60,000 est. value
Jackson, MI 49203

Ottawa County Family Justice Center Bid Packages 2
Renovation
Sub-Bidding
$1,000,000 CJ est. value
West Olive, MI 49460

Last Updated 08/09/2022 12:32 AM
Project Title

City Hall ADA Door Upgrades

Physical Address View project details and contacts
City, State (County) Saint Joseph, MI 49085   (Berrien County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Capitol/Court House/City Hall, Windows/Doors
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Install operators to convert doors to ADA standards. Supply and install ADA compliant automatic door operating devices on one (1) exterior entrance and five (5) interior doors. Interior doors to be converted will include Finance/Inspections, two first floor public restrooms, second floor Commission Chambers and second floor Manager's lobby entrance. The exterior entrance door to be converted is the south public entrance door near the Inspections Department counter Questions regarding the scope of work to be accomplished may be directed to Mike Christensen, Facilities Manager at (269) 930-4408. It is the sole responsibility of the Bidder to see that its proposal is received within the required time period. The City is not responsible for any errors or irregularities with the delivery method utilized for submittal of the Proposal. Any proposals received after the closing date and time will be returned unopened. Any Bidder may withdraw its proposal in person, by facsimile, or by letter, any time prior to the scheduled closing time for receipt of proposals. Each proposal shall be considered binding and in effect for a period of Sixty (60) days after the closing date The City reserves the right to reject any proposals or parts of proposals. The City also reserves the right to waive any irregularities, inconsistencies, or take what other action is appropriate as determined by the City to be in the best interest of the City. The City of St. Joseph reserves the right to reject any and all bids, waive any informalities in bidding and/or to accept the bid or bids should it consider same to be in its best interest.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents