Similar Projects
Shadow Creek Ranch Park Re-Use Waterline (Reflection Bay Dr to Kingsley Dr) - WW1904 - City of Pearland
Infrastructure
Conception
$1,100,000 CJ est. value
Pearland, TX 77584

Southdown Regional Lift Station and Force Main - WW2403 - City of Pearland
New Construction, Infrastructure
Conception
$10,260,000 CJ est. value
Pearland, TX 77584

Wastewater Collection Line Installation in the Alley between 8th and 9th street from Yaupon to Dixie
Infrastructure
Design
$740,000 CJ est. value
Freeport, TX 77541

The Landing at Pearland Clubhouse and Amenities
New Construction, Infrastructure - 4,767 SF
Design
$1,000,000 est. value
Brookside Village, TX 77581

Alvin Elementary Replacement Campus
Demolition, New Construction, Infrastructure
Bidding
$27,000,000 CJ est. value
Alvin, TX 77511

Construction of Bulkheads for the Texas Lake at Stephen F. Austin-munson Historical County Park
Infrastructure
Bidding
$170,000 CJ est. value
Angleton, TX 77515

Brazoria County Courthouse Expansion Justice Center Project
Addition, Demolition, Infrastructure
Sub-Bidding
$240,000 CJ est. value
Angleton, TX 77515

Microwave Intrusion Detention
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Rosharon, TX 77583

Asbestos Abatement and Mold Remediation Unit Pricing Contract
Alteration
Post-Bid
Houston, TX

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Chocolate Bayou Detention Phase Three (Basin T Phase One) and Earthwork to Serve Meridiana
Results
TX

Clearing and Grubbing to Serve Pomona Phase 6 Improvements
Infrastructure
Results
TX

Popshelf / Alvin
New Construction, Infrastructure - 10,640 SF
Construction
$1,020,000 CJ est. value
Alvin, TX 77511

Lake Jackson Apartments Renovation
Renovation, Infrastructure
Pending Verification
$8,000,000 CJ est. value
Lake Jackson, TX 77566

Infinium Electrofuel Facility
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Brazoria, TX 77422

Last Updated 08/11/2022 09:13 AM
Project Title

Hickory Slough Sportsplex Detention Pond Phase 2 - DR2301 - City of Pearland

Physical Address View project details and contacts
City, State (County) Pearland, TX 77584   (Brazoria County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $3,140,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of the final phase of the detention pond for Hickory Slough including the final build out of the storm water lift station and weir structure. The pond provides for 95 acre feet of detention. The detention pond basin floor is designed to match the existing layout for 6 sports fields (2 multi-purpose and 4 soccer) and expanded parking area, plus construction of back slope swales and drains, and hydro-mulching for erosion control. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of August 11, 2022, further details regarding design and construction have not been identified.* * Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents