Similar Projects
Boiler Bottom Blowdown Valve Replacement
Renovation
Sub-Bidding
$109,000 CJ est. value
Allouez, WI 54301

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Private Property Inflow And Infiltration Reduction - Residential Plumbing Contractors
Term Contract
Post-Bid
Milwaukee, WI

Northwest Restroom Facility MEP
Renovation, Alteration - 3,500 SF
Results
$2,336,300 est. value
West Allis, WI 53214

2022 Sanitary Sewer Lining Mayer Street Area
Infrastructure
Results
$402,130 CJ est. value
Neenah, WI 54956

2022 Lead Service Line Replacement
Infrastructure
Construction
$581,013 CJ est. value
Hartford, WI 53027

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Kewaskum School Cooler Expansion
Infrastructure, Alteration
Post-Bid
$100,000 est. value
Kewaskum, WI 53040

Welding Lab MEP Relocations for Equipment Connections
Alteration
Results
$200,000 est. value
Appleton, WI 54914

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall
Renovation
Construction
$5,290,000 CJ est. value
Madison, WI 53706

Pumping of Grease Traps and Catch Basins
Alteration
Post-Bid
River Falls, WI

PSTC Propane Piping Replacement
Alteration
Results
$700,000 est. value
Appleton, WI 54914

Liquid Waste Pumping and Inspection Services
Alteration
Post-Bid
Madison, WI

Flood Resiliency Improvements at Jones Island Water Reclamation Facility
Renovation, Infrastructure
Results
$2,063,000 CJ est. value
Milwaukee, WI 53204

Water Heater Replacement and Miscellaneous Plumbing Repairs - Weatherization
Alteration
Post-Bid
$200,000 est. value
Milwaukee, WI

Last Updated 06/04/2023 11:02 PM
Project Title

Laundry Water Piping Replacement

Physical Address View project details and contacts
City, State (County) Boscobel, WI 53805   (Grant County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $223,225 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of: Replace all old undersized, compromised / leaking original 160 deg F hot water supply and return piping for the laundry operations at WSPF. The supply/return lines that are currently routed above the ceiling of the Main Kitchen and Laundry areas then proceeds up to the maintenance mezzanine to the hot water tank storage all needs to be replaced. This work will also include the relocation of the existing circulating pump

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents