Similar Projects
Demolish Trent Barn and Construct Replacement Building at The Lincoln's New Salem State Historic Site
New Construction, Demolition
Design
Petersburg, IL 62675

Building Demolition
Demolition
Bidding
Rochelle, IL 61068

Demolition and Site Clearance of Identified Structures
Demolition
Bidding
IL

Demolition of Property at 515 Paxton
Demolition
Post-Bid
Calumet City, IL 60409

Demolition Five Single Family Homes
Demolition
Post-Bid
Waukegan, IL

2020 District Wide Demolitions Phase II at St. James Farm
Demolition
Results
Wheaton, IL 60189

Demolition, Hardscape and Landscape Improvements
Demolition
Results
South Holland, IL 60473

Clarifier Conversion
Renovation
Bidding
$7,545,250 est. value
Decatur, IL 62521

Demolition and Site Clearance of Identified Structures
Demolition
Post-Bid
IL

Demolition
Results
Champaign, IL 61820

Demolition Service
Demolition
Bidding
Oak Lawn, IL 60453

Demolition
Demolition
Post-Bid
Calumet City, IL

Demolition
Results
Alton, IL 62002

Knoch Knolls Park Timber Footbridge Demolition
Demolition
Bidding
Naperville, IL

Building Demolition 3138 W 95th Street
Post-Bid
Evergreen Park, IL 60805

Last Updated 11/11/2021 04:53 PM
Project Title

Demolition of Structure

Physical Address View project details and contacts
City, State (County) Rock Falls, IL 61071   (Whiteside County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the Demolition of the residence decks, sidewalks, drives, Fences, underground oil tank and removal of all debris. All concrete to be removed 2 ft below grade. Site to be filled and graded with a minimum of 12 inches of top soil and seeded. Water and sewer lines to be removed and capped per the City of Rock Falls Codes. Basement floors to be fractured to allow drainage. Removal of all volunteer trees and bushes. All Local State and Federal laws must be followed. Site to be cleared of all rubbish, trash brush and debris. Demolition project to be completed with 30 days of acceptance of bid. Contractor is responsible for all required permits at 215 Ave C, Rock Falls, Illinois

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents