Project Title | Middle Tank Repairs Phase 4 Slope Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Clifton, CO (Mesa County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storage/Water Tanks |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $149,800 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project for which bids are being accepted includes the removal and installation of approximately 180 feet of 16 DR-14 C905 PVC pipe, approximately 60 feet of 8 C900 PVC pipe, and related appurtenances to accommodate installation of upgraded overflow and tank drain lines at the District s Finished Water Storage Tanks, located north of Interstate 70 at the 32.25 Road alignment. Additionally, side slope stabilization consisting of the removal of approximately 1,350 cubic yards of native materials, replaced with approximately 1,850 cubic yards of compacted, imported fill. The contractor shall be responsible for all pipe, pipe accessory materials, backfill, compaction compliance, disturbed surface restorations, and other associated work. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |