Similar Projects
West Concrete Water Storage Tank
Post-Bid
Less than $2,250,000 est. value
Falcon, CO

Middle Water Storage Tank Foundation Stabilization
Post-Bid
Less than $200,000 est. value
Clifton, CO 81520

Upper Water Storage Tank Rehabilitation Project
Results
Del Norte, CO

1 Million Gallon Water Storage Tank
Results
Less than $4,630,916 est. value
Steamboat Springs, CO 80477

Moraine Park Campground and HQ Utilities
Post-Bid
Grand Lake, CO

Liquid De-Icer Storage Tanks
Results
Arvada, CO 80002

Water Tank Cleaning and Inspection
Post-Bid
Canon City, CO

0.5 MG East Barclay Tank Rehabilitation Project
Results
Craig, CO 81625

Underground Storage Tank Repairs
Post-Bid
Denver, CO 80225

Widefield Terminal Tank Rehabilitation
Results
Colorado Springs, CO 80947

Prequalification: Price Park Tank Replacement
Post-Bid
Longmont, CO

Sunset Mesa Water Tank and Pump Station Project
Results
Less than $4,000,000 est. value
Montrose, CO

On Call Tank and Monitoring Services
Post-Bid
CO

Potable Water Storage Tank Cleaning and Comprehensive Inspection
Results
Steamboat Springs, CO 80477

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

Last Updated 11/22/2021 10:05 AM
Project Title

Middle Tank Repairs Phase 4 Slope Stabilization

Physical Address View project details and contacts
City, State (County) Clifton, CO   (Mesa County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $149,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project for which bids are being accepted includes the removal and installation of approximately 180 feet of 16 DR-14 C905 PVC pipe, approximately 60 feet of 8 C900 PVC pipe, and related appurtenances to accommodate installation of upgraded overflow and tank drain lines at the District s Finished Water Storage Tanks, located north of Interstate 70 at the 32.25 Road alignment. Additionally, side slope stabilization consisting of the removal of approximately 1,350 cubic yards of native materials, replaced with approximately 1,850 cubic yards of compacted, imported fill. The contractor shall be responsible for all pipe, pipe accessory materials, backfill, compaction compliance, disturbed surface restorations, and other associated work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents